38
ZAPEX 3502 en
Operating instructions 10/2017
Bleed the next oil pump, connect it to oil channel II and operate it at the pressure specified on the
dimensioned drawing until the oil emerges at oil channel III.
Bleed the next oil pump, connect it to oil channel IV and operate it at the pressure specified on the
dimensioned drawing until a ring of oil emerges at the end face.
Bleed the next oil pump, connect it to oil channel III and operate it at the pressure specified on the
dimensioned drawing until a ring of oil emerges at the end face.
Carefully note the order!
During the entire operation the pressure must be maintained at a constant level on all
the oil channels to which pressure is applied.
If, when pressure is applied, oil emerges to the extent that pressure cannot be maintained, a thicker oil must
be specified.
Only when an unbroken ring of oil emerges from both end faces and after a subsequent waiting period of
approx. 30 minutes can pressure be applied to the hydraulic cylinder (”Lukas”) to slide the coupling hub
smartly off the shaft.
All the oil must be completely collected and disposed of in accordance with the
regulations applying.
Note the stroke of hydraulic cylinder. If readjustment is necessary, the end face of the
hydraulic cylinder (”Lukas”) must stop between two oil channels.
After detaching, the oil pumps and retaining device must be removed from the coupling hub.
The hub bore and the shaft should be examined for damage and protected against rust. Damaged parts
must be replaced.
For refitting, the instructions in section 6, "Assembly", and section 7, "Startup", must be carefully
observed.
10.6
Demounting the coupling parts with stepped bore for removal by oilhydraulic shrinking off
Demounting is done as described in item 10.5, except that a motordriven pump is connected to the oil
channel located at the point of transition from the smaller bore to the larger, as a large quantity of oil per
unit of time is needed here.
For refitting, the instructions in section 6, "Assembly", and section 7, "Startup", must be carefully
observed.
Summary of Contents for Zapex ZWB
Page 2: ......