14
Installation and
operating instructions
FLAMCO-FILL PE INSTALLATION AND OPERATING INSTRUCTIONS
TP.04/02/09.EN
Edition 2009 / EXP
7
Maintenance and troubleshooting
The water and the contact surfaces can be 70 °C or more.
•
Wear the required protective clothing.
•
The floor can be wet or greasy. Wear protective shoes.
•
7.1
Before maintenance
There can be life voltage on the terminal
bars even when the main power supply is
disconnected. Make sure all external power
supplies (e.g. external refill equipment) are
also disconnected from the automat.
A
Remove the side cover (A) to gain access to the
internal parts. Both left and right covers can be
removed.
Release the pressure of the water compartment before maintenance.
7.2
After a power failure
The programmed parameters of the controller do not change after a power failure. The SCU-unit (the
clocktimer) has backup power for about one week.
Check the condition of the automat for integrity after a power failure.
•
7.3
Maintenance interval
Confirm maintenance in the service menu.
Interval
Component
Activity
Annually
Fill-PE
Check leak tightness of joints, pumps and screw
connections.
If necessary, seal or tighten the screw connections.
Every year before the peak period
On-site dirt trap in
the feed line
Clean the guards
7.4
Change the automat for water treatment
Switch off water treatment in the equipment menu and change the module.
•
Adjust the capacity in the parameter menu.
•
Switch on “water treatment” in the equimpent menu.
•