Installation instruction

 

FläktGroup 

DC_8658GB   20181214_R0

We reserve the right to make changes without prior notice

5

GENERAL INSTRUCTIONS

LIFTING AND TRANSPORT, OUTDOOR VERSION

The weight of each multi-function block is specified on the rating 
plate. Use EQAZ-06 lifting tubes and EQAZ-07 lifting spreader set 
to lift the unit/blocks on to the previously prepared foundation.

LIFTING A UNIT PROVIDED WITH A BASE FRAME

EQAZ-04

Lifting tube EQAZ-06

4500 kg

MAX.

Base frame EQAZ-04

Stand EQAZ-03

Lifting

spreader set 

EQAZ-07

Lifting

spreader set

EQAZ-07

Lifting tube

EQAZ-06

Lifting tube

EQAZ-06

Max. 60°

Max. 80°

MAX.

2000 kg

Note!

– Lift tubes are only suited for air handling
  units supplied from FläktGroup.
– The lift tubes must only be used for
  the specific unit that they have been 
  ordered to.
– The lift tubes are adapted for each unit size.
– The lift tubes are intended to lift the unit once.
–  If there is a base frame, the screws that 

secure the base frame with the unit must 
always be checked before lifting to ensure 
they are intact.

Max. 2000 kg  EQAZ-03

Max. 4500 kg  EQAZ-04

Lifting tube EQAZ-06

Base frame EQAZ-04

or Stand EQAZ-03

Piece of wood min. 50 x 50 L = 1 m

Lifting spreader set

EQAZ-07

Lifting device

EQAZ-02

EQAZ-04

Weather-resistant

sealing strip fitted

around the entire joint.

The upper unit section

must be secured by EQAZ-16

jointing piece set.

Max. distance between

jointing pieces: 1,5 m

(see next page).

Max 1050 kg

Summary of Contents for EQAZ-04

Page 1: ...ion unit sizes 009 090 8 Jointing of air handling unit blocks 9 Suspended mounting from the ceiling 12 Heavy duty installation 12 Suspended installation hygienic version unit sizes 005 090 13 Unit sta...

Page 2: ...d be a service aisle in front of the electrical cabinet this is to be arranged so that the cabinet can be serviced safely in accordance with local electrical safety regulations Planning for work of th...

Page 3: ...st 5 times the mass of the vibrationisolated object i e the air hand ling unit above and supported on anti vibration mountings If the floor has a light structure its mass and rigidity can be improved...

Page 4: ...rgerandheavierunitscanberaisedbyusingahand operated form loader on both short sides to avoid damage to the under side of the unit Lifting by means of a forklift truck with extended forks to avoid dama...

Page 5: ...000 kg Note Lift tubes are only suited for air handling units supplied from Fl ktGroup The lift tubes must only be used for the specific unit that they have been ordered to The lift tubes are adapted...

Page 6: ...nuts through the angle bracket beam and cross beam to 28 Nm 2 1 150 EUAZ 2 Casing ASSEMBLY OF THE EQAZ 04 IN SEPARATELY DELIVERED VERSION The base frame can be supplied either in assembled or unassemb...

Page 7: ...n functional components with a drainage facility Lateral and longitudinal position adjustment is most easily performed with a roller crowbar or similar MOUNTING ON THE FOUNDATION OUTDOOR VERSION UNIT...

Page 8: ...14_R0 Wereservetherighttomakechangeswithoutpriornotice 8 JOINTING OF AIR HANDLING UNIT BLOCKS GENERAL INSTRUCTIONS 20 x 10 mm 15 x 5 mm 1 2 EQGA EQGB 15 3 5 A 1 3 5 B 1 2 1 1 1 1 A 2 1 2 1 B NOTE Inst...

Page 9: ...n Fl ktGroup DC_8658GB 20181214_R0 Wereservetherighttomakechangeswithoutpriornotice 9 GENERAL INSTRUCTIONS EQGA EQGB 20 x 10 mm 15 x 5 mm 1 2 2 2 2 1 2 2 2 1 C C EQHA EQHB EQGA EQHB EQGB 2 1 2 1 2 1 2...

Page 10: ...nally NOTE If the unit is ordered with lifting devices they are mounted in the factory After usage they should be removed and discarded The docking devices should be mounted at the same location using...

Page 11: ...Group DC_8658GB 20181214_R0 Wereservetherighttomakechangeswithoutpriornotice 11 GENERAL INSTRUCTIONS 3 2 4 1 1 Rear side Tip In cases were accesability is limited on the rear side of the unit A thread...

Page 12: ...or sizes 036 090 Example 1 Retaining flange A max 35 mm along the inspection side unite sizes 005 090 Cut and remove the edge A at the hinge locations to unite sizes 005 090 Retaining flange A max 75...

Page 13: ...d the stand from hangers Larger units must be equipped with EQAZ 29 flour grating to enable service personel to enter The frame must also be executed so that so that the base panels have either transv...

Page 14: ...ngth of lower unit and fit a bar for height compensation under the front frame sectiion Fit EQAZ 16 01 1 sealing strip around the opening of the empty section before fitting the upper unit The EQAZ 16...

Page 15: ...9 SINGLE DECK CASING 005 008 DOUBLE DECK CASING The following supporting surface is required for a vertical arrangement Flat floor or frame made of angle steel for example 50 x 50 x 5 with outer dimen...

Page 16: ...lded edges of the roof sections meet and secure it by applying light hammer blows to snap it on PG slip clamp to be fitted over the joints between the units supplied PG slip clamp factory mounted Roof...

Page 17: ...akechangeswithoutpriornotice 17 GENERAL INSTRUCTIONS TO DISMANTLE THE HANDLES WITH WITHOUT LOCK LOCK WITHOUT HANDLE TO ADJUST THE HINGES Back off the screws and shift the hinge in the appropriate dire...

Page 18: ...s only and provided that the air handling unit has not been disas sembled The order should also state the product code The code can be found on a separate data panel located on the functional compo ne...

Reviews: