GENERAL INSTRUCTIONS
SUSPENDED INSTALLATION, HYGIENIC VERSION,
UNIT SIZES 005-090
Place the unit on a stand made on site as shown in the examp-
les below. Suspend the stand from hangers.
Larger units must be equipped with EQAZ-29 flour grating to
enable service personel to enter.
The frame must also be executed so that so that the base
panels have either transverse or longitudinal support rails on
the underside.
N.B.!
If the unit is equipped with a EQWZ-02
drainage trough, there are retaining flanges
(A) only at the casing corner pieces.
cc max 600
cc max 600
3154 3;6 EUG(A,B) FIG 23
2%
Seen from B
Seen from B
3154 11;19,2 EUWA FIG