8.9
Heat pipe
Observe the following checkpoints for commissioning:
Upright heat pipe
Place the coil with warm airflow (return air) on the bottom and the cold airflow (fresh
air) - on the top.
Heat pipe with horizontal
installation with a fixed slope
Place the coil with warm airflow (return air) on the bottom and the cold airflow (fresh
air) - on the top.
Upright or horizontal with
bypass damper control:
For commissioning refer to "Commissioning of dampers and shut-off dampers" on
page 61.
8.10 Liquid-coupled energy recovery coil
Refer to „Heater assembly (pumped warm water)“ on page 55.
8.11 Plate-type heat exchanger
•
If energy recovery is done with a bypass arrangement, check dampers for correct
operation (refer to „Damper blades and shut-off dampers“ on page 70).
•
Check bypass damper for proper operation, if required.
8.12 Damper blades and shut-off dampers
Complete the following commissioning steps:
•
If several dampers are linked together, ensure that the connecting linkage is
installed properly and is moving freely.
•
Check all screw connections for proper fit.
For actuators
•
Adjust the connecting linkage to ensure a turning angle of 90° with damper blades
reaching their final position when closed (consider tightening torques).
•
Check if the damper actuator moves to its final positions.
ELECTRICAL HAZARD AND DANGER OF ROTATING UNIT PARTS WITH
SHARP EDGES! OBSERVE PERSONAL PROTECTION MEASURES
Please consider the safety instructions on page 52.
Hazardous voltage and risk of rotating components!
Please consider the safety instructions on page 52.
HAZARDOUS VOLTAGE AND RISK OF ROTATING COMPONENTS! OB-
SERVE PERSONAL PROTECTION MEASURES
Please consider the safety instructions on page 52.