11
weight increasing rod (#31).
3.
Attach the front column (#4) to the front base frame (#2) with 3 M10x100 hex head
bolts (#70), 6 flat pads
Φ10
(#56) and 3 M10 lock nuts (#73).
4.
Place the top beam (#8) in the position shown in the figure, put the connector piece
(#17), fix it with 2 M10x60 hex head bolts (#67), 4 flat pads
Φ10
(#56) and 2 M10 lock
nuts (#73), fix the top beam (#8), rear top beam (#54) and counterweight guide bar (#5)
with 2 M10x25 hex bolts (#64) and 2 flat pads
Φ10
(#56).
5.
Install the pulley single U-frame (#21) on the left U-frame of the front column (#4) with
1 M10x65 hex head bolt (#68), 2 flat pads
Φ10
(#56) and 1 M10 locknut (#73).
Installation steps
Summary of Contents for MLD-M5
Page 1: ...MLD M5 Fitness Equipment Co LTD ...
Page 4: ...3 General Assembly Drawing MLD M5 Executed Standard GB17498 1 ...
Page 8: ...7 ...
Page 9: ...8 ...