13
Figure 4
1.
Attach the 2
Φ60
end caps (#71) to the left attachment (#11) of the push arm, then
attach the foam
Φ53xΦ90x245
(#35) to the left attachment (#11) of the push arm.
2.
Insert the upper shaft part of the left attachment (#6) of the push arm into the left side
of the winged rack (#16) as shown and secure with a flat pad
Φ12
(#81) and a lock nut
M12 (#80).
3.
Insert the upper shaft of the push arm left attachment (#11) into the push arm left
attachment (#6) as shown and secure it with a locking cap (#82).
4.
Attach the push arm handle (#51) to the push arm right attachment (#11) with 1
hexagonal bolt M10x25×25 (#64) and 1 arc pad Ø10 (#62); then lock the long pull
handle (with iron piece) (#50) to the other end of the push arm handle (#51) with 1
hexagonal bolt M10x25 (#64) and 1 large flat pad Ø10 (#59)
;
5.
Assemble the right part in the same manner.
Installation steps
Summary of Contents for MLD-M5
Page 1: ...MLD M5 Fitness Equipment Co LTD ...
Page 4: ...3 General Assembly Drawing MLD M5 Executed Standard GB17498 1 ...
Page 8: ...7 ...
Page 9: ...8 ...