Seite/Page 36 Grundlagen_deu.R01 - Kapitel/Chapter 3:
10.5.11
WATER".
• Drain engine oil as specified. Refill engine with preservative oil to the max. level on the oil dipstick.
• Drain diesel from tank and refill with a protective mixture (90 % diesel and 10 % preservative oil) (level to full).
Let engine warm up for 10 min.
• Dismount V-belt as specified, wrap and store in a dry location. Protect against UV radiation.
Attention!
Cover alternator apertures.
Cleaning fluids and preservatives must not enter the
alternator. Risk of destroying the alternator.
• Clean engine as per manufacturer's instructions.
• Spray engine parts and V-belt disks with preservative.
• Clean air filter housing and spray with preservative (metal housing only).
• Close off intake and exhaust apertures (e.g. with tape or end caps).
Attention!
Before recommissioning, remove preservatives and pro-
tective measures.
3.3.3.2 Measures for removing surface protection after medium term downtimes (3 to 6
months).
• Check battery charge status and recharge if necessary. Observe instructions of the battery manufacturer.
• Check cooling water anti-freeze level and cooling water level and refill as necessary.
• Drain engine oil. Replace oil filter and engine oil as per the specification.
• Remove preservatives from the engine with petroleum spirit.
• Degrease V-belt disks and mount V-belt according to instructions. Check V-belt tension!
• If applicable, open turbocharger oil pressure line and fill clean engine oil into channel.
• Hold engine stop lever in zero delivery position and crank engine manually several times.
• Clean air filter housing with petroleum spirit, check air filter and replace if necessary.
• Remove covers from exhaust aperture and intake apertures.
• Connect battery. Close battery main switch.
• Hold stop lever on generator motor in neutral position and crank starter for approx. 10 seconds. Then, pause for 10
seconds. Repeat this procedure 2 times.
• Perform visual check of the generator similar to initial commissioning and start up generator.
3.3.4 Measures for extended downtimes / decommissioning
Downtimes (more than 6 months)
3.3.4.1 Surface protection measures:
• Check battery charge status and recharge regularly, roughly every 3 months, as necessary. Observe instructions
of the battery manufacturer.
• Check cooling water anti-freeze level and refill as necessary.