
Seite/Page 4 Inhalt/Contens
16.1.15
Inhalt / Contens
Special Service Instructions and Measures for Extended Machine Downtimes and Decommissioning 34
3.8.1
Measures for medium term downtimes / hibernation ...................................................... .... 35
3.8.3.1
Measures for removing surface protection after medium term downtimes (3 to 6
months). 36
Measures for extended downtimes / decommissioning .................................................. .... 37
3.8.4.1
Measures for removing surface protection after extended downtimes / recommissioning
(over 6 months): 37
Type plate at the Generator ............................................................................................................ .... 39
4.1.1
The Panda iControl2 panel ............................................................................................................. .... 45
4.3.1
Placement ...................................................................................................................................... ..... 56
5.3.1
Fuel system installation................................................................................................................... .... 59
5.5.1
Fischer Panda installation kit - Fuel system ................................................................... .... 59
5.5.1.1
The following items need to be installed: ......................................................... .... 61
Generator DC system installation ................................................................................................... .... 65
5.6.1
Connection of the remote control panel - see separate control panel manual ............... .... 71
Connection of electrical components .............................................................................................. .... 71
5.7.1
Installation PMGi inverter - See separate PMGi 8000 inverter manual .......................... .... 73