39
Weatherproof procedures
Mastic tape
2.
Remove the sun shield because you must put tape around all of the
connector.
3.
Ensure that the cable and connectors are clean. Clean off oil, water, grease,
and dirt before you continue.
4.
Wrap a layer of electrical tape (sticky side out) over the arrestor to node
connector and wrap approximately 2.5 cm (1 inch) of cable. Overlap the tape
by 40% with each turn.
5.
Repeat for the antenna cable to arrestor connection.
Summary of Contents for HotPort 5020-LNK
Page 1: ...HotPort FiretideInstallationGuide HotPort 5020 LNK Nodes Published March 2014 Revised 2016...
Page 8: ...HotPort5020point to pointsolution 2...
Page 16: ...Beforeyoupermanentlyinstall 10...
Page 32: ...HotPort 5020 LNK node installation 26...
Page 39: ...Troubleshooting 33 8 RemovetheEthernetcable...
Page 40: ...Troubleshooting 34...