HotPort 5020-LNK node installation
17
Connect to earth ground
Caution!
The wire in this picture might
!
not be the correct gauge for your
application. Consult a certified installer
for grounding materials for your
application.
Now you are ready to weatherproof the cable connections.
Installing a node and antenna assembly
The process to install a node to a mast or tower is the same as a roof installation.
Note:
Collect and take all tools and materials with you to the installation site.
Warning!
Do not install this product on a windy or rainy day.
To install a node and antenna assembly in a permanent outdoor location:
1.
Safely lift and carefully put the assembly on the roof.
2.
Attach the pole to which the node and antenna are attached to a mast,
tower, or roof.
-
Attach the cables that have integrated lightning arrestors, or attach
the cables and install lightning arrestors.
-
Make drip loops with cables.
-
Install all grounding equipment. See “Grounding a HotPort node.”
3.
Make all connectors weatherproof. See the
Firetide Best Practices Guide
.
Caution.
Do not use the 12 VDC power supply from a HotPort 7020 mesh
node to power a HotPort 5020 node. The HotPort 5020 needs power
from a PoE+ (802.3at compliant) or 15 VDC power supply.
!
Summary of Contents for HotPort 5020-LNK
Page 1: ...HotPort FiretideInstallationGuide HotPort 5020 LNK Nodes Published March 2014 Revised 2016...
Page 8: ...HotPort5020point to pointsolution 2...
Page 16: ...Beforeyoupermanentlyinstall 10...
Page 32: ...HotPort 5020 LNK node installation 26...
Page 39: ...Troubleshooting 33 8 RemovetheEthernetcable...
Page 40: ...Troubleshooting 34...