background image

11      

 

 

 

 

vi30/40 Dual Cooled QSG Version 2.1

Firestar™ vi30/40 Dual Cooled Laser Quick Start Guide

13.1 

DB- 9 Connector.

13.3    Optional 

Quick Start  

 

  Plug for the Laser.

13.2 

DB- 9 Interface.

Control Connections:

13. 

  If using the UC-2000 controller, see the 

UC-2000 QSG 

located on our website, then connect the

    

 

 laser’s

 

control DB-9/BNC 

interface to the laser.  (See the following figures.)

Warning!

Serious Personal 

Injury

The Quick Start Plug bypasses the laser’s safety interlock function, 

potentially exposing personnel to hazardous invisible laser radiation.

If using a UC-2000 Universal Laser Controller, refer to the 

UC-2000 Laser Controller Quick Start 

Guide 

and it

Operator’s Manua

for setup and operation instructions located on our website.  

Continue below and to the next section.

Note:  

Note:

   IF not using a SYNRAD controller for your laser, AND your OEM vi30/40 laser is put into service  

 

    for the first time, OR it has been re-located and has not been sed yet in its new location,   

 

 

    functionality should be verified. Go to the 

next section

Optional 

Quick  

 

  Start Plug for the Laser.

Summary of Contents for vi30

Page 1: ...ossible then immediately notify the shipping carrier responsible party and SYNRAD After unpacking review the Inventory list in the Intro section within the operators manual If you need a replacement b...

Page 2: ...one metric or SAE fastener per mounting tab on the baseplate Do not use any type of jackscrew arrangement as this will twist the baseplate and may distort the tube Important Note SYNRAD does not reco...

Page 3: ...v30 height for upgrading from v30 to vi30 40 for mounting from above The Tall Wide mounting kit SYNRAD P N 250 20190 02 6 Standard Mounting Drill three thru holes in the final mounting surface that co...

Page 4: ...unting Feet Matches v30 Beam Exit Height Tall Wide Mounting Feet Matches v30 Beam Exit Mounting When mounting the Firestar laser use only one metric or SAE fastener per mounting tab on the baseplate D...

Page 5: ...t be less than 3 0 in 76 mm Minimum fan to wall clearance is 2 25 in 57 2 mm otherwise damage will occur 3 0 in 76 mm 3 0 in 76 mm Front 8 If temperature monitoring is desired see the following figure...

Page 6: ...he Technical Reference section of the laser s Operation Manual Airflow Direction Front to Rear Allow 6 inches clearance Recommended fan shroud design for rear cooling Caution Possible Equipment Damage...

Page 7: ...know Our lasers incorporate the following wetted materi als in the coolant path nickel plated brass copper Acetal nitrile Viton PBT Delrin Polyethelene and stainless steel Avoid glycol based additive...

Page 8: ...no more than 6 6 mm 0 26 in into the cooling manifold Maintain coolant pH above 7 Operating the laser with a coolant temperature below the dew point of the surrounding air may cause condensation to o...

Page 9: ...ce the humidity of the enclosure containing the laser D Install gas purge Introduce nitrogen or dry filtered air into the laser housing See Assist gas purity and Purge gas specifications in the Techni...

Page 10: ...the laser chassis serves as DC power ground If you need to isolate the body of the laser from the equipment chassis ground use an insulating pad or film and insulated mounting hardware OEM vi30 40 la...

Page 11: ...the laser s safety interlock function potentially exposing personnel to hazardous invisible laser radiation If using a UC 2000 Universal Laser Controller refer to the UC 2000 Laser Controller Quick S...

Page 12: ...to the appropriate pins and that the appropriate signal levels are applied Failure to do so may damage the laser Vi Series lasers MUST be provided with a pre ionizing tickle signal during standby or...

Page 13: ...ated PWM Command signal to the laser s CTRL input connector Refer to Controlling laser power in the Technical Reference chap ter in your laser s Operation Manual for tickle and PWM Command signal desc...

Page 14: ...uency of 5 kHz at a 5 volt level and ensure that the controller s duty cycle is set to zero percent output 0 0 23 Apply a Laser Enable signal to the DB 9 I O connector The yellow RDY lamp turns on to...

Reviews: