background image

5      

 

 

 

 

vi30/40 Dual Cooled QSG Version 2.1

Firestar™ vi30/40 Dual Cooled Laser Quick Start Guide

>

2.25 in (57.2 mm)

‘Minimum’ clearance

9.

  Installing the fans:  Assure the gap between fan and laser must be less than 3.0 in (76 mm). Minimum  

 

fan-to-wall clearance is 2.25 in (57.2 mm) otherwise damage will occur!

< 3.0 in (76 mm)

< 3.0 in (76 mm)

Front

8

.

 

If temperature monitoring is desired, see the following figure for customer supplied external tempera- 

 

ture sensor.

Top View

Front

Measure chassis temperature

at this location

Cooling: 

9.1

   Dual-cooled units can be cooled with either fans or water. (vi30 shown).

Summary of Contents for vi30

Page 1: ...ossible then immediately notify the shipping carrier responsible party and SYNRAD After unpacking review the Inventory list in the Intro section within the operators manual If you need a replacement b...

Page 2: ...one metric or SAE fastener per mounting tab on the baseplate Do not use any type of jackscrew arrangement as this will twist the baseplate and may distort the tube Important Note SYNRAD does not reco...

Page 3: ...v30 height for upgrading from v30 to vi30 40 for mounting from above The Tall Wide mounting kit SYNRAD P N 250 20190 02 6 Standard Mounting Drill three thru holes in the final mounting surface that co...

Page 4: ...unting Feet Matches v30 Beam Exit Height Tall Wide Mounting Feet Matches v30 Beam Exit Mounting When mounting the Firestar laser use only one metric or SAE fastener per mounting tab on the baseplate D...

Page 5: ...t be less than 3 0 in 76 mm Minimum fan to wall clearance is 2 25 in 57 2 mm otherwise damage will occur 3 0 in 76 mm 3 0 in 76 mm Front 8 If temperature monitoring is desired see the following figure...

Page 6: ...he Technical Reference section of the laser s Operation Manual Airflow Direction Front to Rear Allow 6 inches clearance Recommended fan shroud design for rear cooling Caution Possible Equipment Damage...

Page 7: ...know Our lasers incorporate the following wetted materi als in the coolant path nickel plated brass copper Acetal nitrile Viton PBT Delrin Polyethelene and stainless steel Avoid glycol based additive...

Page 8: ...no more than 6 6 mm 0 26 in into the cooling manifold Maintain coolant pH above 7 Operating the laser with a coolant temperature below the dew point of the surrounding air may cause condensation to o...

Page 9: ...ce the humidity of the enclosure containing the laser D Install gas purge Introduce nitrogen or dry filtered air into the laser housing See Assist gas purity and Purge gas specifications in the Techni...

Page 10: ...the laser chassis serves as DC power ground If you need to isolate the body of the laser from the equipment chassis ground use an insulating pad or film and insulated mounting hardware OEM vi30 40 la...

Page 11: ...the laser s safety interlock function potentially exposing personnel to hazardous invisible laser radiation If using a UC 2000 Universal Laser Controller refer to the UC 2000 Laser Controller Quick S...

Page 12: ...to the appropriate pins and that the appropriate signal levels are applied Failure to do so may damage the laser Vi Series lasers MUST be provided with a pre ionizing tickle signal during standby or...

Page 13: ...ated PWM Command signal to the laser s CTRL input connector Refer to Controlling laser power in the Technical Reference chap ter in your laser s Operation Manual for tickle and PWM Command signal desc...

Page 14: ...uency of 5 kHz at a 5 volt level and ensure that the controller s duty cycle is set to zero percent output 0 0 23 Apply a Laser Enable signal to the DB 9 I O connector The yellow RDY lamp turns on to...