7. INSERT FLUE SYSTEM
For Installation in a Masonry Fireplace
WARNING:
The Fire and Flue system
must be installed in accordance with
AS/NZS 2918:2001 and the
appropriate requirements of the relevant
building code or codes. If the flue system
has been AS/NZS 2918:2001 Appendix
F tested by the flue manufacturer then
their specifications supersede the
standard requirements and must be
adhered to
.
1. Position Fire in fireplace. Extend
plumb line from top of chimney,
ensuring Fire spigot is in line with top
of the chimney. If not, flue offsets will
be required.
2. Assemble flue ensuring all seams
are in line and assembly is straight and
tight with crimped ends pointing
downwards.
Secure flue with at least 3 stainless
steel or monel rivets and seal.
3. Fasten chimney plate supplied onto
the chimney top. The chimney plate
must be weather sealed with silicone
or mortar.
4. Install chimney liner on top of the
chimney plate.
5. Ensure flue is extended over the
chimney liner by 180mm. Secure top
spacer bracket to the flue and ensure
slots fit snugly inside the chimney liner.
6. Slide flashing cone over top of
flue, until it rests firmly over top spacer.
Ensure ventilation gap is not closed off.
Secure with pop rivets or self
-
tapping
Diagram 4
WARNING: The Fire and Flue System shall be installed in accordance with AS/NZS
2918:2001 Appendix F and the appropriate requirements of the relevant building code
or codes. Firenzo/SFP Flue Kits or Davin Flue Kits must be used.
CAUTION: Mixing of Fire or Flue System components from different sources or
modifying the dimensional specifications of components using more than 1 metre of
extra flue may result in hazardous conditions. Where such action is considered the
manufacturer should be consulted in the first instance.
7. Fit anti
-
down draught cowl. Do not
secure as it must be removed for
cleaning.
Summary of Contents for Kompact AG Series
Page 9: ...Kompact AG Installation November 2018 9 6 TYPICAL INSULATION REQUIREMENTS ...
Page 15: ...Kompact AG Installation November 2018 15 ZERO CLEARANCE BOX Built in Fire Canopy ...
Page 18: ...Kompact AG Installation November 2018 18 ZERO CLEARANCE BOX Built in Fire Canopy ...
Page 19: ...Kompact AG Installation November 2018 19 ZERO CLEARANCE BOX Built in Fire Canopy ...
Page 20: ...Kompact AG Installation November 2018 20 ZERO CLEARANCE BOX Built in Fire Canopy ...
Page 21: ...Kompact AG Installation November 2018 21 ZERO CLEARANCE BOX Built in Fire Canopy ...
Page 22: ...Kompact AG Installation November 2018 22 ZERO CLEARANCE BOX Built in Fire Canopy ...
Page 27: ...Kompact AG Installation November 2018 27 14 KOMPACT WITH ATHENA FASCIA ...
Page 29: ...Kompact AG Installation November 2018 29 KOMPACT WITH DECO FASCIA ...
Page 33: ...Kompact AG Installation November 2018 33 KOMPACT WITH FORTE FASCIA ...