background image

Kompact AG Installation—November 2018                                                                                                                                                    41

 

 

17.  DOOR GLASS

 

     

The inserts are equipped with a self

-

cleaning glass air wash system.  A discolouration can 

form  after a long 

low

’ 

burn, but 30 minutes of 

high

’’ 

burn should clear it from the glass.

 

 

Clean glass with wet newspaper dipped in ash from the firebox, then wipe glass.

 

Do NOT clean glass while hot.

 

 

CAUTION:  

THIS FIRE SHOULD NOT BE OPERATED WITH A CRACKED GLASS.

 

 

If a replacement of glass is required:

 

 

GLASS MUST BE REPLACED WITH FIRENZO CERAMIC GLASS

 .                

 

 Insulating material for the glass should be replaced at this time also. 

 

 

NEVER 

place glass  directly against the door.   Without the insulation seal tape in place, 

the glass is likely to shatter.  Your Firenzo agent will be able to supply any spare parts.

 

 
 

18.

 

SAFETY

 

 

All surfaces on the inserts will get hot and cause burning if touched by bare hands. 

 

Firenzo recommends using a fireguard.

 

 

The  heat  from  inserts  will  effectively  dry  laundry  and  other  wet  articles;  however  such    
materials should be kept well clear of the Fire to prevent accidental fires. 

 

The  Flue  should  be  cleaned  regularly  to  avoid  flue  fires.  In  such  event,  close  the  air       
control. Do 

NOT

 open door. Remove combustible item from near the Fire and Flue.

 

Summary of Contents for Kompact AG Series

Page 1: ...ome Heating Association solid fuel appliance installation technician SFAIT or other suitably qualified person The Fire and Flue System must be installed in accordance with AS NZS2918 All Installations must be in accordance with these instructions Consult with the building authority having jurisdiction to determine the need for a permit prior to commencing the installation Failure to follow these i...

Page 2: ... Requirements 24 11 Mantel Clearances 25 12 Installation of Kaowool ISB Insulation in a Built in Canopy 26 13 Assembly Instructions Zero Clearance Box Built In Fire Canopy 27 28 14 KOMPACT with ATHENA Fascia 29 30 KOMPACT with DECO Fascia 31 32 KOMPACT with DIVA Fascia 33 34 KOMPACT with FORTE Fascia 35 37 KOMPACT with PLAZA 780mm 1000mm Fascia 38 15 Operating Instructions 39 Operating Instruction...

Page 3: ...DS or AEROSOLS in the vicinity of this FIRE when it is operating Use caution when reloading with fuel Do NOT attempt to load fuel into the Fire when the fire inside the stove is at or near its peak Do NOT burn large quantities of paper or combustible material that would create an extremely hot quick fire Do NOT burn highly coloured paper or brochures junk mail USE ONLY DRY WOOD 25 or less moisture...

Page 4: ...adherence to these instructions will meet these standards Any variation from these installation instructions or any doubt about them must be checked against the requirements of the standards Please leave this manual with the owner when installation is complete KOMPACT ZERO CLEARANCE BOX IN A MASONRY FIREPLACE OR ENCLOSURE 3 FLOOR PROTECTION REQUIREMENTS AS NZ2918 Section 3 3 states that if the Fir...

Page 5: ... has no heat sensitive materials in its construction it must meet the following MINIMIUM dimension as marked A B from above A 300mm from breast of fire to outer edge of concrete floor protector hearth B 30mm from heat sensitive floor to upper edge of concrete floor protector hearth The minimum width of floor protector must be 820mm and or 410mm from the centre of the Fire ...

Page 6: ... Ensure any cracks are sealed loose masonry repaired and the chimney swept Check the dimensions of your fireplace opening are adequate to accept the new Fire Existing linings may need to be removed The Fire must be installed on a level non combustible base An Insulated Floor Protector Hearth must consist of a minimum of 20mm of Insulation board Promatech H Eterpan LD Pacbld Pro or product of simil...

Page 7: ...is may be reduced if a Firenzo Kompact deflector is fitted A Unprotected B With Firenzo Deflector Kompact Diva 975mm N A Kompact Forte 975mm 915mm Kompact Athena 1100mm 915mm Kompact Deco 1225mm 915mm Kompact Plaza 1225mm 915mm SIDE PILLAR CLEARANCE The minimum clearance from the side of the fascia to any heat sensitive material must be 5mm providing the material does NOT protrude more than 150mm ...

Page 8: ... firebox and flue are in position place 25mm white Kaowool blanket supplied on top of casing 7 As this fire sources its combustion air from the chimney cavity enclosure the Fire MUST be sealed around the front between the casing and the masonry This is achieved by packing the yellow ISB insulation supplied between the casing and the masonry at the FRONT ONLY to maximum depth of 80mm As shown on pa...

Page 9: ...Kompact AG Installation November 2018 9 6 TYPICAL INSULATION REQUIREMENTS ...

Page 10: ...om the chimney cavity the fire must be sealed using the yellow ISB insulation provided around the front of the casing and masonry enclosure at the FRONT ONLY to a maximum depth of 80mm UNDER NO CIRCUMSTANCES SHOULD THE AIR SUPPLY INTO THE AIRPORTS ON THE SIDE OF THE FIRE BE RESTRICTED ...

Page 11: ...top The chimney plate must be weather sealed with silicone or mortar 4 Install chimney liner on top of the chimney plate 5 Ensure flue is extended over the chimney liner by 180mm Secure top spacer bracket to the flue and ensure slots fit snugly inside the chimney liner 6 Slide flashing cone over top of flue until it rests firmly over top spacer Ensure ventilation gap is not closed off Secure with ...

Page 12: ...Kompact AG Installation November 2018 12 8 INSERT FLUE SYSTEM FOR INSTALLATION IN A ZERO CLEARANCE BOX FIREPLACE ...

Page 13: ...op of the floor protector 2 The flue cowl must be at least 600mm above the highest point of the roof if within 3 metres of it or 1 metre above the roof penetration if more than 3 metres from the ridge 3 No part of the building or any adjacent building may be in or above a circular area of a horizontal radius of 3 metres from the flue exit ...

Page 14: ...O CLEARANCE BOX BUILT IN FIRE CANOPY A ZERO CLEARANCE BOX Built in Fire Canopy IS REQUIRED IF THE FIRE IS NOT BEING INSTALLED INTO A MASONRY FIREPLACE For Zero Clearance Box installations see the following pages 15 to 22 ZERO CLEARANCE BOX Built in Fire Canopy ...

Page 15: ...Kompact AG Installation November 2018 15 ZERO CLEARANCE BOX Built in Fire Canopy ...

Page 16: ...Kompact AG Installation November 2018 16 DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE STATED STANDARD FRAME ZERO CLEARANCE BOX Built in Fire Canopy ...

Page 17: ...Kompact AG Installation November 2018 17 Dimensions taken from Zero Clear ance Box ZERO CLEARANCE BOX Built in Fire Canopy ...

Page 18: ...Kompact AG Installation November 2018 18 ZERO CLEARANCE BOX Built in Fire Canopy ...

Page 19: ...Kompact AG Installation November 2018 19 ZERO CLEARANCE BOX Built in Fire Canopy ...

Page 20: ...Kompact AG Installation November 2018 20 ZERO CLEARANCE BOX Built in Fire Canopy ...

Page 21: ...Kompact AG Installation November 2018 21 ZERO CLEARANCE BOX Built in Fire Canopy ...

Page 22: ...Kompact AG Installation November 2018 22 ZERO CLEARANCE BOX Built in Fire Canopy ...

Page 23: ...Kompact AG Installation November 2018 23 10 FLOOR PROTECTOR REQUIREMENTS FOR A ZERO CLEARANCE BOX BUILT IN CANOPY FIRE WITH HEAT SENSITIVE FLOOR Fire ...

Page 24: ...200mm deep A Unprotected not tested with deflector Kompact Athena 1180mm B With Firenzo Deflector Only Kompact Deco 1180mm Kompact Diva 1180mm minimum Kompact Forte 1180mm minimum Kompact Plaza 1180mm Kompact Serenity 1180mm Non heat sensitive non combustible mantle no greater than 200mm deep A Unprotected deflector not required All Kompact fires 1180mm SIDE PILLAR CLEARANCE The minimum clearance ...

Page 25: ...Kompact AG Installation November 2018 25 12 INSTALLATION OF KAOWOOL AND ISB INSULATION IN A ZERO CLEARANCE BOX ...

Page 26: ...as per instructions on pages 11 13 if using a Zero Clearance Box Built in Fire Canopy 6 As this Fire sources its combustion air from the chimney cavity enclosure the Fire MUST be sealed around the front between the casing and Zero Clearance Box This is achieved by packing the yellow ISB insulation supplied between the casing and the built in canopy at the FRONT ONLY to maximum depth of 80mm UNDER ...

Page 27: ...Kompact AG Installation November 2018 27 14 KOMPACT WITH ATHENA FASCIA ...

Page 28: ... granite ashlip from the fascia box and fit below the door opening using the two locator screws at the bottom of the firebox screws for granite ashlip 5 see illustration 1 These two screws protrude by 5mm to enable the ashlip to be lifted up and over the screw heads and then screw up tight 4 4 4 3 5 3 Athena Ashlip 4 Fit the bottom grill on to the 2 locating screws Bottom Grill 3 4 6 5 Fit the top...

Page 29: ...Kompact AG Installation November 2018 29 KOMPACT WITH DECO FASCIA ...

Page 30: ...opening using the two locator screws at the bottom of the firebox Screws for granite ashlip 3 see illustration 1 These two screws protrude by 5mm to enable the ashlip to be lifted up and over the screw heads and then screw up tight Attach the bottom grill 2 Granite ashlip 5 Bottom grill 5 3 4 Place the keyhole brackets on the 3 plate Deco fascia over the protruding screws on the back plate Screws ...

Page 31: ...Kompact AG Installation November 2018 31 Assembly and Installation Instructions KOMPACT with DIVA Fascia ...

Page 32: ... 15mm self tap screw below the door opening 6 4 Fit the air control knob 7 Fit the granite ashlip 8 provided by securing it to the bottom support plate by inserting the locking pin on the support plate into the hole on the bottom of the granite ashlip Finally fit the door Locate the hinges correctly by angling the door at approximately 45 degrees 2 3 4 1 Remove door Place the backplate with bottom...

Page 33: ...Kompact AG Installation November 2018 33 KOMPACT WITH FORTE FASCIA ...

Page 34: ...Kompact AG Installation November 2018 34 Assembly and Installation Instructions KOMPACT with FORTE Fascia ...

Page 35: ...Kompact AG Installation November 2018 35 KOMPACT WITH 780MM PLAZA FASCIA 780mm Fascia Masonry ONLY ...

Page 36: ...Kompact AG Installation November 2018 36 KOMPACT WITH 1000MM PLAZA FASCIA 1000mm Fascia Masonry and Zero Clearance ...

Page 37: ...Kompact AG Installation November 2018 37 Assembly and Installation Instructions KOMPACT with PLAZA Fascia ...

Page 38: ...n door carefully and place small pieces then larger logs on top 6 Close door tight and leave Air Control on HIGH for some 30 minutes The value in establishing this technique is that you are providing an excellent base for burning your wood effectively 7 When a good fire is established move air control to middle position DO NOT IMMEDIATELY SHUT THE FIRE TO LOW Remember to close the air con trol gra...

Page 39: ...almost empty Fire set at the same position Remember you only get out of any Fire what you put into it The better the fuel the better the Fire Do NOT burn plastic household refuse or driftwood This will void any Warranty and reduce the lifespan of the fire FLAMMABLE LIQUIDS CAUTION Never use gasoline type fuel kerosene charcoal lighter fuel or similar liquids to start or freshen up a fire in this F...

Page 40: ...urer s instructions for spraying Never spray a hot fire BLACK OR SILVER PLATED RAILS The black or silver plated rails must not come in contact with abrasive materials Use a clean damp cloth when the Fire is cool if cleaning is required FIRE BRICKS The internal fire bricks on the sides and base of the firebox can crack in extreme heat However they are safe to leave as is until they start to crumble...

Page 41: ...ting material for the glass should be replaced at this time also NEVER place glass directly against the door Without the insulation seal tape in place the glass is likely to shatter Your Firenzo agent will be able to supply any spare parts 18 SAFETY All surfaces on the inserts will get hot and cause burning if touched by bare hands Firenzo recommends using a fireguard The heat from inserts will ef...

Page 42: ...Guarantees Act 1993 To the fullest extent permitted at law no other warranties or guarantees express or implied are assumed or given by Firenzo to any person with respect to the quality merchantability description or fitness for purpose or use of Firenzo wood fires or their component parts and materials 6 Firenzo is not liable for and to the maximum extent permitted by law excludes any liability f...

Page 43: ...covered by the warranties or the entire Firenzo wood fire at its discretion where Firenzo is reasonably satisfied a defect is solely due to faulty Firenzo workmanship or materials 14 Firenzo may decline in whole or part to honour a warranty claim until any amounts due but unpaid by a consumer in respect of the Firenzo wood fire or its servicing are paid until Firenzo is provided with the applicabl...

Page 44: ... questions about the warranties or this document please contact Firenzo at its specified address on telephone 06 8438260 by email at firenzo firenzo co nz or via the Firenzo website www firenzo co nz 18 This document is intended to form part of and may be expressly referenced in the terms of sale and purchase by every original New Zealand consumer of a Firenzo wood fire Without limiting that inten...

Page 45: ...Kompact AG Installation November 2018 45 ...

Page 46: ... Encore Lady Kitchener Napier Viking Vision Insert Aqualux Athena Bay Flush Forte Bay Flush Kompact Athena Kompact Deco Kompact Diva Kompact Forte Kompact Plaza Kompact Serenity Topaz 98 Niven Street PO Box 3231 HB Mail Centre Napier 4142 Phone 06 8438260 Website www firenzo co nz email firenzo firenzo co nz ...

Reviews: