![Filtec ft-70 Operation Manual Download Page 81](http://html1.mh-extra.com/html/filtec/ft-70/ft-70_operation-manual_2288788081.webp)
FT-70/75 Fill Level Inspectors Operator’s Guide
5-4
120 Day Maintenance
Inspect
Nameplate, Stickers, and Instruction Plates
Inspect
Inspection Head Housing for dirt and moisture
Service
Pneumatic components per Rejector Manual
Lubricate
All Trigger Raising Mechanism lead screws and ways
Action
Description
Inspect
Inspection Head Housing for dirt and moisture
Inspect
Wiring, insulation, terminals, and terminal blocks inside
the Inspection Head and External Junction Box.*
Inspect
X-ray Emitter and Detector aperatures for damage
blockage.
*Not all units are equipped with the optional External Junction Box.
Action
Description
Industrial Dynamics Company, Ltd. Document 40274-0600