TWINFLEX
®
SRP Remote Status Indicator Engineering and Commissioning Manual
18
Commissioning
Ensure that the RSI has been correctly and securely mounted to the wall.
For each RSI, verify that the Date and Time match the date and time on the SRP Control Panel.
For each RSI, verify that a check mark appears in the upper right corner of the RSI Home Screen.
For each RSI, carry out all 5 tests from the
“2. TEST MODES”
option in the MAIN MENU.
Verify that the Current Events on the RSI are displayed correctly and match the Current Events on
the SRP Control Panel.
If SW1 HOLD operation and SW2 RELEASE operation are being used, verify that they function
correctly.
Ensure the system users and responsible persons have been trained properly. See
the “End User
Training
” section below.
Fault finding
If the Date and Time do not update on the RSI and are not in sync with the SRP Control Panel, check
the wiring between the SRP Control Panel and the RSI.
If the supervision check mark is not present in the upper right corner of the
RSI’s display, check
the RSI supervision setting on the SRP Control Panel. Also, verify the address setting on the RSI.
The SRP Control Panel reports an
“RSI Missing”
fault and the RSI reports an
“SRP Communication Timeout . . .”
message if the communication is lost between them. Check the
wiring and the RSI supervision setting.
The RSI reports a
“NON-Supervised RSI Function Disabled”
message when trying to view Current
Events and the RSI is not being supervised by the SRP Control Panel. Fix the supervision setting on
the SRP Control Panel.