Fetco E1231IN-1B123-PM000 Users Manual And Operator Instructions Download Page 4

Go to fetco.com for the latest versions of all information         

Page 4

      

User Guide & Operator instructions

   

P211

e0

November 2021

 

 

 

Enter Programming 

Screens shown are for twin brewer.  Single brewer will not have menu A4-A6.   

There are seven menu groups-A-G .  See the following pages for the batch parameter definitions and all settings for the brewer

 

 

TO ENTER PROGRAMMING 

1-Turn brewer “OFF” from power switch 

2-Turn power switch to “ON” 

 

…Screen will initialize  and then 

 display digital process notifications 

 

3-After Initialization-Red “STOP” Lamp turns on 

4-Quickly press “STOP” button. 

 

        When brewer is In PROGRAMMING MODE 

      -the screen will display:

 

       

                         

|BATCH PRG| 

|A   

(or B-H)

   | 

-

Illuminated LED indicates active keypad positions 

 

See the following pages for batch parameter 

definitions and all settings for the brewer

 

 

 

 

 

Turn power OFF 

Turn power ON 

Wait for red LED 

And quickly press STOP 

button on front touch pane 

 

First screen will display 

for PROGRAMMING-A 

Scroll through main menu 

topics by pressing “STOP” 

button. 

Note: Only the left side buttons of a two sided brewer are used for programming

 

 

 

Starting The Brew 

 

1. Turn the power switch “ON”.  (Twin Shown) 

2. Prepare a brew basket with the correct size

 

filter and appropriate amount of 

coffee. 

3. Slide the brew basket completely into the

 

rails. 

4. Place a clean, empty, and preheated dispenser

 

under the brew basket. 

5. Select a batch & hold the corresponding BREW button in

 

for 1 second to start  

6. -STOP button will illuminate,   

    -Countdown time will display,  

   -Selected BREW button will flash to indicate brew is in progress.  

    -All other BREW buttons for that brew head will extinguish. 

 

7. When the brew cycle is finished, 

STOP

 

button will extinguish and the BREW button will

 

continue to flash for the 

amount of time

 

programmed into the DRIP DELAY setting.  

This

 

indicates that coffee may still be dripping from

 

the brew basket 

For safety- do not remove brew basket until drip-out is complete. 

 

Twin Brewer ready to brew.  Example shown: Pressing top right brew position 

Brewing-see #6 above  

The Brew Sequence 

 

First screen 

shows top right 

brew position 

being activated, 

(as above)… 

 

Left side is in 

“READY-MODE” 

during brew, but 

left side buttons 

can be accessed 

for brewing 

 

STOP brew lamp 

activates and top 

right button will 

pulsate.   

 

All other buttons on 

the right side 

extinguish. 

 

Count down timer 

activates beginning 

5:30 for Batch 1 

5:00 for Batch 2 

 

The brewing cycle  

completes in four 

minutes.  Stop button 

extinguishes  and drip 

out starts at 1:30 

minutes.   

Do not remove brew 

basket during this 

segment. 

Brewer returns to 

“ready to brew” (screen 

one) after drip out 

completes 

 

STOP 

Ready       Brewing 

            5:30 

STOP 

 

STOP 

Ready       Brewing 

            2:55 

STOP 

 

STOP 

Ready       Drip 

                  1:30 

STOP 

STOP BUTTON 

On/OFF switch 

located lower 

right on back of 

brewer 

 

  Batch Program 

  A 

STOP 

STOP 

 

CBS-1232 

ver     2.1.210323 

STOP 

STOP 

 

STOP 

FETCO 

Ready to Brew 

STOP 

 

STOP 

FETCO 

Ready to Brew 

STOP 

Summary of Contents for E1231IN-1B123-PM000

Page 1: ...de and Operator Instructions CBS 1231 CBS 1232 Extractor Plus Brewing System FETCO PLUS Commercial Beverage Equipment CBS 1232 CBS 1232 3 0 4 0 Extractor Plus Brewers shown with 2 2 liter Air Pot sold...

Page 2: ...y Weight Filled Weight Shipping Weight Shipping Dimensions CBS 1231 Brewer 27 3 4 in 700 mm 11 3 4 in 300 mm 20 in 520 mm 3 3 gallon 12 4 L 29 lbs 13 2 kg 55 lbs 25 0 kg 41 lbs 18 6 kg 30 x 17 x 22 76...

Page 3: ...erminal Block 1 10 9 13 0 7 7 gal 29 1 L CBS 1231PLUS 3 0 4 0 Lit er Coffee B rewers C E m odels Electrical and Output Specifications Schuko cor d and pl ug 50Hz SKU Voltage Heater C onfiguration Wire...

Page 4: ...rew basket 5 Select a batch hold the corresponding BREW button in for 1 second to start 6 STOP button will illuminate Countdown time will display Selected BREW button will flash to indicate brew is in...

Page 5: ...90 Copy Batch B13 Filter Life F14 Override Lt BBS See Page 12 A91 Copy Batch From F15 Override Rt BBS A92 PASTE To F16 Override Lt BBL F17 Override Rt BBL Left and Right top and middle batches are per...

Page 6: ...30 minutes 2 00 12 00 0 30 Default total brew time is 5 30 minutes A2 30 Prewet Perc 0 0 00 25 0 1 Percentage of total brew volume A2 40 Prewet Delay Brew pause after prewet completes 0 1 00 Min 0 10...

Page 7: ...mperature ft m Suggested Setting F Boiling point F Suggested Setting C Boiling point C 0 0 205 212 0 96 100 0 500 152 205 211 0 96 99 5 1000 305 200 210 1 93 98 9 2000 610 200 208 1 93 97 8 2500 762 2...

Page 8: ...ncrements Notes D1 Heater SSR Test Press button 2 to test button 1 stops test Activates heater Default is 10 sec Toggle OFF or ON Energizes Heater s WARNING Service use only D2 Fill Valve Test Press b...

Page 9: ...47G 61oz 1 05 1 60Liter 0 39 0 55G 50 71 fl ounces 0 05L 0 01G 1 oz Adjusts flow rate E6 LT Bypass valve flow rate 1 30 liters minute 0 36 gallon minute 46 ounces minute 1 10 1 65Liter 0 28 0 42G 37...

Page 10: ...NO Follow prompts Saves settings Insert blank USB F9 Restore From USB Applies settings from USB Insert USB Will need reboot F10 Restore Defaults NO NO YES Reset to factory When selecting F10 RESTORE...

Page 11: ...r short potting during brew cycle Investigate cause of low flow rate Clogged water filter 101 Error on refill Tank did not refill within expected time Water supply flow rate is too low Watch for short...

Page 12: ...Volume LT Left brew valve flow through volume Gallons Liters Totalized volume through left valve CBS 1232 only G27 A Lt Brew Volume R G28 A Rt Brew Cycles LT Right brew valve operation on off Count T...

Page 13: ...en From SAVE screen Press button 2 to toggle to the SAVE YES screen To SAVE and EXIT Press button 1 to SAVE your changes and EXIT NOTE User Settings will be erased and overwritten to factory default s...

Page 14: ...er such as URNEX TABZ DIP IT or Squeak n Clean 2 Carefully Follow the instructions supplied with the cleaning product 3 Never use spray cleaners solvent solvent based cleaner or petroleum based polish...

Page 15: ...possible 4 All beverage equipment must use a water filter A finishing carbon filter is preferred 5 Install the filter unit after a water shutoff valve and in a position to facilitate filter replacemen...

Page 16: ...nit warranty and may lead to electric shock or burn as well as damage to unit and or its surroundings 7 If the power cord requires repair or replacement it must be performed by the manufacturer or aut...

Page 17: ...1232 4 required for CBS 1231 Legs are sent from factory inside brew basket Attach legs before installing 2 Adjust dispenser locator for either 3 Liter 1 Gallon dispensing Set Dispenser Locator Shown...

Page 18: ...rts Diagram CBS 1231 Drawing 1101 00570 00 Parts CBS 1231 6 Part Number1102 00471 00 ELECTRICAL COMPONENT LATTICE 2 1 2 legs Extends to 3 5 8 Part number 1073 00016 00 3 required for CBS 1232 4 requir...

Page 19: ...41 31 11 1082 00017 00 SCREW TRUSS HD PHIL MACHINE 6 32 X 1 2 LG 32 1 1046 00035 00 LABEL WARNING TO REDUCE RISK OF ELECTRIC SHOCK OR FIRE 33 1 1402 00098 10 HARNESS LOW AMP CBS 1230 UL 34 1 1046 000...

Page 20: ...ts Diagrams CBS 1232 6 Part Number1102 00471 00 ELECTRICAL COMPONENT LATTICE Drawing 1101 00571 00 Parts CBS 1232 2 1 2 legs Extends to 3 5 8 Part number 1073 00016 00 3 required for CBS 1232 4 requir...

Page 21: ...023 00355 00 LOCATOR AIRPOT ADAPTER CBS 2230 29 1 1001 00408 00 COVER TOP CBS 2232 42 30 1 1001 00409 00 COVER UPPER BASE CBS 2232 42 31 11 1082 00017 00 SCREW TRUSS HD PHIL MACHINE 6 32 X 1 2 LG 32 1...

Page 22: ...UNDERSIZED ZINC PLATED 9 1 1107 00021 00 HEATER ASSEMBLY IMMERSION 1500W 120VAC 9 1 1107 00022 00 HEATER ASSEMBLY IMMERSION 1700W 120VAC 9 1 1107 00020 00 HEATER ASSEMBLY IMMERSION 2300W 240VAC 9 1 11...

Page 23: ...OTH LOCKWASHER 8 10 1084 00010 00 NUT HEX 6 32 UNDERSIZED ZINC PLATED 9 2 1107 00022 00 HEATER ASSEMBLY IMMERSION 1700W 120VAC 9 2 1107 00019 00 HEATER ASSEMBLY IMMERSION 2300W 120VAC 10 2 1003 00140...

Page 24: ...FITTING STRAIGHT GROMMET 400 10 1 1023 00166 00 FITTING COLD WATER INLET GROMMET DESIGN 11 2 1107 00019 00 HEATER ASSEMBLY IMMERSION 2300W 120VAC 11 2 1107 00020 00 HEATER ASSEMBLY IMMERSION 2300W 240...

Page 25: ...02 00113 00 SWITCH REED ASSEMBLY 5 1 1102 00479 00 ASSEMBLY CASCADE SPRAY DOME NEXT GEN ORANGE 6 2 1057 00076 00 VALVE ASSEMBLY COMPLETE NG DELTROL interchangeable with 1057 00078 00 6 2 1057 00078 00...

Page 26: ...BB HANDLE 1023 00191 00 GREEN PLUG BB HANDLE 1023 00192 00 ORANGE PLUG BB HANDLE 1023 00180 00 BLUE PLUG BB HANDLE Stainless Steel Brew Basket Ref Qty Part Number Description B003218B1 Complete Stain...

Page 27: ...Go to fetco com for the latest versions of all information Page 27 User Guide Operator instructions P211e0November 2021 Wiring Diagrams SSR SSR SKU E1231US 1X117 PM001 CBS 1231 Domestic Dual Voltage...

Page 28: ...com for the latest versions of all information Page 28 User Guide Operator instructions P211e0November 2021 S S R Wiring diagram 1401 00190 10 E1231US 1A115 E1231US 1A123 E1231US 1X117 E1231IN 1B130 C...

Page 29: ...com for the latest versions of all information Page 29 User Guide Operator instructions P211e0November 2021 SSR Wiring diagram 1401 00196 10 E1232US 1B223 E1232US 1B230 E1232IN 1B223 E1232IN 1B230 CB...

Page 30: ...End of section notes N...

Reviews: