![Fetco E1231IN-1B123-PM000 Users Manual And Operator Instructions Download Page 17](http://html.mh-extra.com/html/fetco/e1231in-1b123-pm000/e1231in-1b123-pm000_users-manual-and-operator-instructions_2285233017.webp)
Go to fetco.com for the latest versions of all information
Page 17
User Guide & Operator instructions
P211
e0
November 2021
Brewer Setup
NOTE-Assemble legs after unpacking the brewer and before connection to utilities
1) attach legs for 3 Liter/ 1 Gallon dispensing
STANDARD WITH UNIT
1” legs -
Attach this length for
3 Liter air pot configuration
NOT INCLUDED. Purchase separately
2-1/2” legs -
Attach this length for
1 Gallon dispenser or 3 liter air pot.
Part number 1073.00016.00
3 required for CBS-1232
4 required for CBS-1231
Legs are sent from factory inside brew basket. Attach legs before installing
2) Adjust dispenser locator for either 3 Liter / 1 Gallon dispensing
Set Dispenser Locator
Shown with
1 gallon dispenser
locator
-(User option)
Shown with
3 liter air pot
Locator
-(Factory installed)
Layout of the brewer
Operation and service
For installing brewer
Brew basket
Keypad for brewer operation
Hot Water Faucet
ON/OFF Switch
Air pot or Dispenser Locator
(Two for twin side)
SELECT brewer model
From SERVICE MENU (Page 9) go to position F3
Select model and SAVE and EXIT (Page 11)
Be certain to SAVE new settings
USB
Connection
Power
Switch
Electrical
Connection
Water
Supply
Connection
Summary of Contents for E1231IN-1B123-PM000
Page 30: ...End of section notes N...