
12
Festo — YJKP-ST/MT — 2021-11f
Installation
The cable is pre-assembled ready for installation.
1. Insert plug into the connection [X4] of the motor controller.
2. Insert the plug into the connection [X18] of the controller.
Connecting cable of the digital control interface [X1]
The connecting cable supplies power to the circuitry of the digital controller interface [X1] of the motor
controller.
Connecting cable NEBC-S1G25-P-1.5-N-LE6
CMMP-AS-...-M0 connection [X1]
provided by customer
Pin
Use
Wire colour
1)
Type YJKP
Connection
7
Fieldbus: offset node number bit 1 BN
0.8/ 1.5/ 4
GND
7/ 12/ 17
+24 V DC
8
Fieldbus: offset node number bit 3 YE
All
GND
9
Controller enable
GY
All
+24 V DC
19
Fieldbus: offset node number bit 0 WH
0.8/ 1.5/ 7/ 12
GND
4/ 17
+24 V DC
20
Fieldbus: offset node number bit 2 GN
All
GND
21
Output stage enable
PK
All
+24 V DC
1) Colour code in accordance with IEC 60757:1983-01
Tab. 4: Connecting cable NEBC-S1G25-P-1.5-N-LE6 circuitry, digital control interface [X1]
1. Insert plug into the connection [X1] of the motor controller.
2. Place the open cable ends in accordance with the table.