3
Mounting and installation
28
Festo – MPAC-VI-EN – 2017-12a – English
(1)
(1)
(3)
(3)
(5)
(3)
(5)
(5)
(1)
(12/14)
1
2
3
4
5
6
1
Left end plate with port (1), (3) and (5)
for supply to pressure zone 1
2
Pressure zone 1
3
Pressure zone 2
4
Pressure zone 3
5
Right end plate with port (1), (3) and (5)
for supply to pressure zone 3
with port (12/14) for supply to the pilot
control of all pressure zones
6
Supply plate with port (1), (3) and (5) for
supply to pressure zone 2
Fig. 3.1
Example: Valve terminal with 3 pressure zones