BlueHelix HiTech RRT C
327
EN
cod. 3541V300 - Rev. 00 - 02/2021
3. Service and maintenance
B
All adjustments described in this chapter can only be
carried out by qualified personnel.
3.1 Adjustments
Gas conversion
The unit can work with
2
nd
or
3
rd
family gases, which is clearly indicated on the packaging and on
the data plate of the unit. If the unit has to be used with a gas other than the factory-set one, pro-
ceed as follows:
1.Disconnect the power supply and turn off the gas.
2.Remove the front panel (
see ”Opening the front panel” on page 334
).
3.Apply the plate for LPG (contained in the document bag) near the technical data plate.
4.Refit the front panel and turn on the power to the boiler.
5.
Modify the parameter for the type of gas
:
•Access the
Main menu [MENU]
using the button
.
•Follow the path
installer menu [Service]
>enter the
Password 1234
(see fig. 17) >
parame-
ters menu [TSP]
.
•Using the buttons
and
Heating,
select parameter
b03
and set the corresponding value
with the buttons
and
DHW
:
0 =G20
1 =G30/G31
2 =G230
•To confirm, press the button
.
•Turn the power off for 10 seconds and then back on.
•Wait until the
Fh
mode has finished.
•Put the boiler in standby mode and activate the
calibration mode[AUTO SETUP]
(see ”IM-
PORTANT” on page 327 ).
Checking the combustion values
MAKE SURE THE FRONT PANEL IS CLOSED AND THE INTAKE/FUME EXHAUST DUCTS
ARE COMPLETELY ASSEMBLED.
1.Put the boiler in heating or DHW mode for at least 2 minutes.
2.Activate the
Test [TEST]
mode (see ”Test mode [Test]” on page 329 ).
3.Using a combustion analyzer connected to the arrangements located on the starting accesso-
ries above the boiler, with boiler operating at maximum and minimum power check that the CO
2
content in the fumes matches that indicated in the following table.
4.If the combustion values do not match, adjust the Offset values in the
Test mode
as described
in the following paragraph.
IMPORTANT
B
During the CALIBRATION PROCEDURE [AUTO SET-
UP], the TEST PROCEDURE [TEST] or during the CO
2
VALUE CHECK, the FRONT PANEL must be CLOSED
and the INTAKE/FUME EXHAUST DUCTS completely
assembled. Also, the boiler must not be in OFF mode
Case studies
G20
G30/G31
G230
A
New boiler (first ignition/conversion or electrode replacement)
7.5%-9.9% 9%-11.5% 9%-11.5%
B
Boiler with at least 500 hours of operation
9%+/-0.8
10%+/-0.8 10%+/-0.8
Summary of Contents for BlueHelix HiTech RRT C
Page 45: ...BlueHelix HiTech RRT C 45 IT cod 3541V300 Rev 00 02 2021 fig 48 fig 49 fig 50 5 6 6 ...
Page 104: ...BlueHelix HiTech RRT C 104 ES cod 3541V300 Rev 00 02 2021 fig 48 fig 49 fig 50 5 6 6 ...
Page 163: ...BlueHelix HiTech RRT C 163 RO cod 3541V300 Rev 00 02 2021 fig 48 fig 49 fig 50 5 6 6 ...
Page 221: ...BlueHelix HiTech RRT C 221 PL cod 3541V300 Rev 00 02 2021 wygląd 48 wygląd 49 wygląd 50 5 6 6 ...
Page 280: ...BlueHelix HiTech RRT C 280 EL cod 3541V300 Rev 00 02 2021 İȚț 48 İȚț 49 İȚț 50 5 6 6 ...
Page 339: ...BlueHelix HiTech RRT C 339 EN cod 3541V300 Rev 00 02 2021 fig 48 fig 49 fig 50 5 6 6 ...
Page 354: ......
Page 355: ......