ASSEMBLY
12
Handle assembly
•
Install upper frame (handle) onto the lower frame by sliding the handle over the two upright tubes on the lower
frame and pressing down firmly until the handle is seated and the two detent pins snap in place.
Attaching Upper and Lower Gun Hooks
Attach the upper gun hook, install two plastic rivets, until the plastic rivets are snug, you may need to tap with a mallet or
small hammer to seat the lock pin.
Attach the lower gun hook, install the M6 screw & lock nut, wrench tighten until the nut is snug, do not over tighten.
Attaching the Spray Gun
• Screw the spray wand and the trigger handle together until they are secure.
•
nut on by turning clockwise until it is hand tight.
Summary of Contents for FNHPT240
Page 22: ...22 WIRING DIAGRAM...