3.7 Driving the machine; working operation
3.7.1 Driving the machine
Always wear the seat belt when driving.
Only drive on load-bearing surfaces.
Do not drive on ice and snow.
If the machine has touched high-voltage power
lines:
n
do not leave the driver’s stand,
n
warn others from coming close to or
touching the machine,
n
if possible, drive the machine out of the
danger zone,
n
have the power switched off.
Operate the machine only from the driver’s
stand.
Do not adjust the driver’s seat while driving.
Do not climb onto or off the machine while the
machine is driving.
Do not use the machine to transport persons.
In the case of unusual noises and appearance
of smoke, perform troubleshooting to determine
the cause and have the fault corrected.
Match the speed to the working conditions.
Do not make extreme steering movements
when driving with high speed, danger of tipping
over!
Always give way to loaded transport vehicles.
Switch the lights on if visibility is poor.
Always keep a safe distance to excavation pit
borders, embankments and edges.
Refrain from any work that could adversely
affect the stability of the machine.
Concerning your safety – Driving the machine; working operation
BW 120 AD-5
44
Summary of Contents for BOMAG BW 120 AD-5
Page 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Page 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Page 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Page 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Page 97: ...6 Operation Operation BW 120 AD 5 97 ...
Page 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Page 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Page 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Page 190: ...Maintenance As required BW 120 AD 5 190 ...
Page 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Page 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Page 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Page 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Page 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Page 209: ......
Page 210: ......