10.3.3 Central electrics
The central electrics are located in the oper-
ating console.
1.
Unscrew the fastening screws and fold out
the central electrics against the end stop.
The printed circuit board is equipped with a
fuse test socket
‘Fuse Test’
. When plugging in
an intact fuse an LED lights up.
Fuse Amperage
Designation
F03
10 A
Vibration
F04
7.5 A
Instruments
F05
10 A
12 V socket
F06
5 A
Rotary switch for water spraying system
F07
15 A
Hazard light system
F08
15 A
Direction indicators and working head lights
F09
10 A
Parking and tail light, left
F10
10 A
Parking and tail light, right
F11
15 A
Head lights, left
F12
15 A
Head lights, right
F23
10 A
Warning horn
F30
10 A
Potential 15
F37
10 A
Water pump
F45
10 A
Edge cutter
F48
40 A
Preheating system
F68
10 A
Potential 30
F103 10 A
Potential 15
F119 10 A
Engine
Fig. 177
Troubleshooting – Fuse assignment
BW 120 AD-5
199
Summary of Contents for BOMAG BW 120 AD-5
Page 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Page 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Page 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Page 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Page 97: ...6 Operation Operation BW 120 AD 5 97 ...
Page 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Page 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Page 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Page 190: ...Maintenance As required BW 120 AD 5 190 ...
Page 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Page 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Page 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Page 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Page 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Page 209: ......
Page 210: ......