6.9 Emergency procedures
6.9.1 Actuating the emergency stop switch
1.
In events of emergency and in case of
danger actuate the emergency stop switch
immediately.
ð
The engine is shut down and the parking
brake is closed.
6.9.2 Disconnecting the battery
In order to be able to disconnect the battery
quickly in case of danger, e.g. cable fire, the
minus terminal has been designed as a quick
release pole clamp.
1.
Pull up the cap from the minus pole.
ð
The pole clamp comes off the minus
pole.
2.
Disconnect the pole clamp from the minus
pole of the battery and lay it to the side.
6.9.3 Towing the machine
Tow the machine only in case of emergency or
to prevent an accident.
Always use a tow bar.
Towing distance: only out of the direct danger
zone, towing speed: 1 km/h (0.6 mph).
Fig. 91
Fig. 92
Operation – Emergency procedures
BW 120 AD-5
116
Summary of Contents for BOMAG BW 120 AD-5
Page 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Page 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Page 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Page 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Page 97: ...6 Operation Operation BW 120 AD 5 97 ...
Page 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Page 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Page 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Page 190: ...Maintenance As required BW 120 AD 5 190 ...
Page 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Page 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Page 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Page 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Page 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Page 209: ......
Page 210: ......