![Fayat BOMAG BW 120 AD-5 Operating Instruction Download Page 125](http://html1.mh-extra.com/html/fayat/bomag-bw-120-ad-5/bomag-bw-120-ad-5_operating-instruction_3685466125.webp)
7.2 Loading the machine
Use only stable loading ramps of sufficient load
bearing capacity.
Loading ramps and transport vehicle must be
free of grease, oil, snow and ice.
The ramp inclination must be less than the gra-
deability of the machine.
Make sure that any persons keep a safety dis-
tance of at least 2 metres while the machine is
driven onto or down from the transport vehicle.
The instructing person should not be inside the
travel range of the machine.
1.
Fasten your seat belt.
2.
Set the throttle lever to position “MAX I”.
DANGER!
Danger to life caused by the
machine slipping or turning over!
– Make sure that no persons are in
the danger zone.
3.
Drive the machine carefully onto the trans-
port vehicle.
4.
Observe the centre of gravity.
5.
Switch off the engine and remove the igni-
tion key.
6.
Attach and secure the articulation lock
Chapter 8.2.2.1 ‘Engaging the articula-
.
The foldable ROPS can be folded
down to reduce the transport height.
7.
If necessary, fold down the foldable ROPS.
MIN.
MAX II
MAX I
B-880-0160
Fig. 107
Loading / transporting the machine – Loading the machine
BW 120 AD-5
125
Summary of Contents for BOMAG BW 120 AD-5
Page 9: ...1 Introduction Introduction BW 120 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 120 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 120 AD 5 19 ...
Page 62: ...Machine type plate example Fig 29 Concerning your safety Signage BW 120 AD 5 62 ...
Page 64: ...Concerning your safety Danger zones BW 120 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 120 AD 5 65 ...
Page 80: ...Indicators and control elements Engine compartment BW 120 AD 5 80 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 120 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 120 AD 5 96 ...
Page 97: ...6 Operation Operation BW 120 AD 5 97 ...
Page 122: ...Operation Emergency procedures BW 120 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 120 AD 5 123 ...
Page 132: ...Loading transporting the machine Folding down and erecting the foldable ROPS BW 120 AD 5 132 ...
Page 133: ...8 Maintenance Maintenance BW 120 AD 5 133 ...
Page 190: ...Maintenance As required BW 120 AD 5 190 ...
Page 191: ...9 Setting up refitting Setting up refitting BW 120 AD 5 191 ...
Page 194: ...Setting up refitting Manually adjusting the crabwalk BW 120 AD 5 194 ...
Page 195: ...10 Troubleshooting Troubleshooting BW 120 AD 5 195 ...
Page 206: ...Troubleshooting Trouble shooting ECONOMIZER BW 120 AD 5 206 ...
Page 207: ...11 Disposal Disposal BW 120 AD 5 207 ...
Page 209: ......
Page 210: ......