Maintenance - 2000h
4812159001_I.pdf
2019-11-05
Seat bearing - Lubrication
2
3
1
6
4
Figure. Seat bearing
1. Grease nipple
2. Gearwheel
3. Steering chain
4. Adjusting screw
5. Cover
6. Slide rails
7. Marking
7
5
Keep in mind that the chain is a vital part of the
steering mechanism.
Keep in mind that the chain is a vital part of the
steering mechanism.
Remove the cover (5) to access the lubrication nipple
(1). Lubricate the operator seat slew bearing with three
strokes of a hand-operated grease gun.
Clean and grease the chain (3) between the seat and
the steering column.
Also grease the seat slide rails (6).
If the chain is slack on the sprocket (2), loosen the
screws (4) and move the steering column forward.
Tighten the screws and check chain tension.
No not tension the chain too tightly. It should be
possible to move the chain about 10 mm (0.4 in) to the
side with a forefinger/thumb at the marking (7) in seat
frame. Fit the chain lock at the bottom.
If the seat starts to be stiff when adjusting, it
should be lubricated more often than specified
here.
If the seat starts to be stiff when adjusting, it
should be lubricated more often than specified
here.
Hydraulic reservoir - Draining
Fig. Machine's right underside
1. Drain cock
2. Plug
1
2
The condensate from the hydraulic reservoir is drained
through the drainage tap (1).
Drain the roller after it has been stationary for a long
time, e.g. after standing overnight. Drain as follows:
Remove the plug (2).
Place a container under the tap.
Open the tap (1) and let any trapped condensate run
out.
Shut the drainage tap.
Refit the plug.
153
Summary of Contents for DYNAPAC CA2800
Page 2: ......
Page 12: ...e 4812159001_I pdf 2019 11 05...
Page 16: ...Introduction 4812159001_I pdf 2019 11 05 4...
Page 22: ...Safety Optional 4812159001_I pdf 2019 11 05 10...
Page 26: ...Special instructions 4812159001_I pdf 2019 11 05 14...
Page 70: ...Machine description 4812159001_I pdf 2019 11 05 58...
Page 90: ...Operation 4812159001_I pdf 2019 11 05 78...
Page 102: ...Operating instructions Summary 4812159001_I pdf 2019 11 05 90...
Page 104: ...Preventive maintenance 4812159001_I pdf 2019 11 05 92...
Page 114: ...Maintenance Maintenance schedule 4812159001_I pdf 2019 11 05 Service Checklist 102...
Page 120: ...Maintenance 10h 4812159001_I pdf 2019 11 05 108...
Page 126: ...Maintenance first 50h 4812159001_I pdf 2019 11 05 114...
Page 128: ...Maintenance 50h 4812159001_I pdf 2019 11 05 116...
Page 169: ......
Page 170: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...