![Fayat Group DYNAPAC CA2800 Instruction Manual Download Page 99](http://html1.mh-extra.com/html/fayat-group/dynapac-ca2800/dynapac-ca2800_instruction-manual_3714066099.webp)
Miscellaneous
4812159001_I.pdf
2019-11-05
Securing CA2500-CA4600 for loading
Securing the CA2500-4600D/PD vibratory roller from
Dynapac for transport.
Direct of travel
Roller loaded in forward
direction
1 - 3 = double lashings, i.e. one lashing with two parts secured to two different lashing mounts,
symmetrically located on the right and left sides.
1 - 3 = double lashings, i.e. one lashing with two parts secured to two different lashing mounts,
symmetrically located on the right and left sides.
4
= rubber
4
= rubber
The lashings' permitted distance interval in meters
The lashings' permitted distance interval in meters
(1 - 3: Double lashings, LC at least 1.7 tonnes (1700 daN), S
TF
300 kg (300daN))
(1 - 3: Double lashings, LC at least 1.7 tonnes (1700 daN), S
TF
300 kg (300daN))
Double L
1
Double L
2
Double L
3
Double L
1
Double L
2
Double L
3
0,9 - 2,5
0,9 - 2,5
0,1 - 2,5
0,9 - 2,5
0,9 - 2,5
0,1 - 2,5
For lashing 1 is
L
1
the distance between the lashing point on the edge of the platform and the point directly sideways
from the lashing point on the roller perpendicular to the platform edge. The relationship for lashings
L
2
and L
3
is the
same.
For lashing 1 is
L
1
the distance between the lashing point on the edge of the platform and the point directly sideways
from the lashing point on the roller perpendicular to the platform edge. The relationship for lashings
L
2
and L
3
is the
same.
87
Summary of Contents for DYNAPAC CA2800
Page 2: ......
Page 12: ...e 4812159001_I pdf 2019 11 05...
Page 16: ...Introduction 4812159001_I pdf 2019 11 05 4...
Page 22: ...Safety Optional 4812159001_I pdf 2019 11 05 10...
Page 26: ...Special instructions 4812159001_I pdf 2019 11 05 14...
Page 70: ...Machine description 4812159001_I pdf 2019 11 05 58...
Page 90: ...Operation 4812159001_I pdf 2019 11 05 78...
Page 102: ...Operating instructions Summary 4812159001_I pdf 2019 11 05 90...
Page 104: ...Preventive maintenance 4812159001_I pdf 2019 11 05 92...
Page 114: ...Maintenance Maintenance schedule 4812159001_I pdf 2019 11 05 Service Checklist 102...
Page 120: ...Maintenance 10h 4812159001_I pdf 2019 11 05 108...
Page 126: ...Maintenance first 50h 4812159001_I pdf 2019 11 05 114...
Page 128: ...Maintenance 50h 4812159001_I pdf 2019 11 05 116...
Page 169: ......
Page 170: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...