a D:GROUP company
00020EN Rev.09 – 12/2012
23
7.E
REPLACEMENT OF FLUORESCENT LAMPS
(by user).
[See chapter 13 – diagram for maintenance operations].
1.
Switch the cabinet off and disconnect it from the power supply.
2.
Remove the prefilter/s [10].
3.
Unscrew the nuts [16] and remove the lampholder [15].
4.
Replace the lamp [17] and the starter.
5.
For reassembly reverse the above instructions.
6.
Re-connect the cabinet .
7.F
REPLACEMENT OF U.V. GERMICIDAL LAMP
(optional - by user).
[See chapter 13 – diagram for maintenance operations].
1.
Switch the cabinet off and disconnect UV electric connection.
2.
Replace the UV lamp [18] from the inside of the work chamber, taking care not to touch the UV tube with the
hands.
3.
Replace the starter
4.
Reconnect UV electric connection.
IMPORTANT: During the installation of the new lamp, pay attention not to leave fingerprints on the
lamp.
Summary of Contents for FlowFAST H
Page 32: ...a D GROUP company 00020EN Rev 09 12 2012 32...
Page 33: ...a D GROUP company 00020EN Rev 09 12 2012 33...
Page 35: ...a D GROUP company 00020EN Rev 09 12 2012 35 14 B SIDE DIAGRAM...
Page 36: ...a D GROUP company 00020EN Rev 09 12 2012 36 15 CABINET MOUNTING...
Page 37: ...a D GROUP company 00020EN Rev 09 12 2012 37...
Page 38: ...a D GROUP company 00020EN Rev 09 12 2012 38 16 ASSEMBLY of SUPPORT TABLE...
Page 39: ...a D GROUP company 00020EN Rev 09 12 2012 39 17 ASSEMBLY OF THE CABINET ON THE TABLE optional...
Page 40: ...a D GROUP company 00020EN Rev 09 12 2012 40 18 SIDE DIAGRAM WITH U V LAMP optional...
Page 42: ...a D GROUP company 00020EN Rev 09 12 2012 42 20 WIRING DIAGRAM...
Page 43: ...a D GROUP company 00020EN Rev 09 12 2012 43...
Page 44: ...a D GROUP company 00020EN Rev 09 12 2012 44...