a D:GROUP company
00020EN Rev.09 – 12/2012
20
6
OPERATING PROCEDURES
6.A
PRELIMINARY CHECKS
Before carrying out any type of work, the following conditions should be verified:
-
that the cabinet power cable is connected to a 230V-50Hz outlet (if not distinct voltages/frequencies are shown
on the label stuck near the power cable)
-
that the work area inside the cabinet is free from materials used during the previous session
-
that the work chamber has been cleaned/sterilized.
6.B
SWITCHING ON the FLOWFAST H CABINET
To switch on the cabinet, proceed as indicated below:
-
Switch on the cabinet by pressing the key ON/OFF
(if the PCB for the automatic regulation is installed
insert the password: press the button 5
, button 4
and then the button SET
)
-
Switch on the lighting, by pushing the key
The cabinet is ready to work. Wait 5 minutes before starting any operation (see chapter 5).
During this period of time, introduce ALL and ONLY the material indispensable for working in the
internal working zone of the cabinet.
6.C
SWITCHING OFF FLOWFAST H CABINET
At the end of the work session, proceed as follows:
-
Remove the material from the internal work chamber
-
Clean the work surface and the inside walls of the chamber, as indicated in the “Cleaning instructions” (chapter
7A)
-
Turn off the light by pushing the key
-
Turn off the cabinet by pressing the "ON/OFF” key
(if the PCB for the automatic regulation is installed
insert the password: press the button 5
, button 4
and then the button SET
)) or press the "SPEED
REDUCTION" key
In case UV lamp is installed in the cabinet, switch on the germicidal lamp by pushing the “U.V.” yellow button
.
The U.V. lamp will switch on only if the front protective shutter is completely down.
Summary of Contents for FlowFAST H
Page 32: ...a D GROUP company 00020EN Rev 09 12 2012 32...
Page 33: ...a D GROUP company 00020EN Rev 09 12 2012 33...
Page 35: ...a D GROUP company 00020EN Rev 09 12 2012 35 14 B SIDE DIAGRAM...
Page 36: ...a D GROUP company 00020EN Rev 09 12 2012 36 15 CABINET MOUNTING...
Page 37: ...a D GROUP company 00020EN Rev 09 12 2012 37...
Page 38: ...a D GROUP company 00020EN Rev 09 12 2012 38 16 ASSEMBLY of SUPPORT TABLE...
Page 39: ...a D GROUP company 00020EN Rev 09 12 2012 39 17 ASSEMBLY OF THE CABINET ON THE TABLE optional...
Page 40: ...a D GROUP company 00020EN Rev 09 12 2012 40 18 SIDE DIAGRAM WITH U V LAMP optional...
Page 42: ...a D GROUP company 00020EN Rev 09 12 2012 42 20 WIRING DIAGRAM...
Page 43: ...a D GROUP company 00020EN Rev 09 12 2012 43...
Page 44: ...a D GROUP company 00020EN Rev 09 12 2012 44...