
a D:GROUP company
00020EN Rev.09 – 12/2012
5
2.C
ELECTRIC/GAS CONNECTIONS
The electrical connection of FLOWFAST H cabinet is made by connecting the power cable located on the upper of
the right side of the cabinet to a 230V, 50 Hz outlet (if not distinct voltages/frequencies are shown on the label stuck
near the power cable)
If stipulated by local legislation, insert upstream of the power cable an automatic protection overload switch provided
with a differential relay, with a rated switching voltage no greater than 30 mA.
The right side of the bench can be equipped with one or more gas/vacuum intakes with manual tap.
The connection with the gas/vacuum intake is made according to the type of connection: town gas or industrial gas
(air, vacuum, nitrogen, etc.).
The cabinet must be connected with the town gas line through an approved conduit, for safety reasons.
Summary of Contents for FlowFAST H
Page 32: ...a D GROUP company 00020EN Rev 09 12 2012 32...
Page 33: ...a D GROUP company 00020EN Rev 09 12 2012 33...
Page 35: ...a D GROUP company 00020EN Rev 09 12 2012 35 14 B SIDE DIAGRAM...
Page 36: ...a D GROUP company 00020EN Rev 09 12 2012 36 15 CABINET MOUNTING...
Page 37: ...a D GROUP company 00020EN Rev 09 12 2012 37...
Page 38: ...a D GROUP company 00020EN Rev 09 12 2012 38 16 ASSEMBLY of SUPPORT TABLE...
Page 39: ...a D GROUP company 00020EN Rev 09 12 2012 39 17 ASSEMBLY OF THE CABINET ON THE TABLE optional...
Page 40: ...a D GROUP company 00020EN Rev 09 12 2012 40 18 SIDE DIAGRAM WITH U V LAMP optional...
Page 42: ...a D GROUP company 00020EN Rev 09 12 2012 42 20 WIRING DIAGRAM...
Page 43: ...a D GROUP company 00020EN Rev 09 12 2012 43...
Page 44: ...a D GROUP company 00020EN Rev 09 12 2012 44...