GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
16
Revision date: 06.07.18
END WALL INSTALLATION (continued)
9. Measure the distance
between the top of the base tube
and band clamp (Step 7)
to determine the length of the
first vertical section of the door frame tube.
10. Choose one square tube (#102897), insert the swaged
end of the long tube into the plain end of another tube
and tap with a hammer to properly seat the tubes at the
joint.
11. On this assembled frame member, mark the length
determined in Step 9 (above) and
subtract the amount
needed to account for the square-to-round tube
connect bracket
, which is attached to the top of the
frame tube. See the diagram that follows.
12. Select a square-to-round tube connect bracket and
attach the bracket to one end of the vertical frame
member. Use a 5/16" drill bit to drill a hole through the
tube and attach the bracket to the tube using a nut and
carriage bolt.
13. Repeat Steps 9-12 for the remaining vertical frame
member for the door.
14. With the square-to-round tube connect bracket
attached to the top of each vertical door frame tube,
use the bolt in the band clamp to attach the bracket to
the band clamp. DO NOT TIGHTEN AT THIS TIME.
NOTE:
The heads of the bolts for each clamp are to the
outside (or front/back) of the greenhouse. At this point,
the two vertical door frame members should be loosely
attached to the end rafter assembly.
End Rafter
Square-to-
Round Tube
Connect
Bracket
Front (or outside)
of the greenhouse
Vertical Door
Frame Tube
15. Using the marks on the base tube for the rough
opening for the door, attach the bottom of each vertical
frame member to the base tube using an angle bracket.
Consult the end frame diagram.
16. With the vertical door frame tubes attached at the
bottom and loose at the top, measure each frame
member to locate the height of the rough door opening
and mark the location on the inside of the door frame.
Consult the End Frame diagrams in the Quick Start
section located at the back of these instructions.
Frame shown may differ from actual frame.
92-1/4"
92-1/4"
Mark Here
Height of rough
door opening
Door Opening
Angle Bracket
Mark
Base Tube
Center of Door
Frame Tube
Summary of Contents for Growers supply GrowSpan 106306PC
Page 37: ...37 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 FRONT PROFILE...
Page 42: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 42 Revision date 06 07 18 CONNECTIONS...
Page 43: ...43 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION FRAME DETAILS...