GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
32
Revision date: 06.07.18
INSTALL OVERLAP BRACING AND U-CHANNEL — continued
NOTE:
Do not climb on panels to install screws. Take
steps to protect panels during screw installation.
6. Repeat steps as needed to cut and attach additional
1.5" x 1.5" square tubes to secure overlap seam of all
panels.
Install one tube per overlap as shown.
7. Install an additional Tek screw and washer at end of
H-channel if needed to secure channel to rafter. See
photo in Step 5.
8. Continue by reading baseboard installation information
on next page.
ATTENTION:
If you are not installing a baseboard,
skip to and continue by sealing greenhouse using the
supplied silicone sealant.
View from outside of the shelter.
Upper Panel
Installed 104213
U-Channel
Lower Panel
Step 7
Drive FA4484B Tek screw with 102921 neo-bonded
washer through U-channel, both panels, and into the
1.5" x 1.5" square backer tube.
Space screws at 12" on-center.
5. With tube aligned and someone holding it in place
inside the greenhouse, drive FA4484B Tek screws with
neo-bonded washers through from the outside into the
1.5" x 1.5" backer tube.
Actual frame may differ from example shown.
Inside
Greenhouse
Outside
Greenhouse
104213
U-Channel
Lower
Panel
104779 Backer Tube
(inside greenhouse)
Upper
Panel
FA4484B Tek Screw &
102921 Neo-Bonded Washer
Summary of Contents for Growers supply GrowSpan 106306PC
Page 37: ...37 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 FRONT PROFILE...
Page 42: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 42 Revision date 06 07 18 CONNECTIONS...
Page 43: ...43 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION FRAME DETAILS...