SQUARE TUBING INSTALLATION
Use the 102897 square tubing for all end wall framing. Use
the 104779 square tubing (plain ends) to secure the seam
between the roof panels.
READ THIS DOCUMENT BEFORE YOU BEGIN
.
Thank you for purchasing this GrowSpan™ greenhouse.
When properly assembled and maintained, this product will
provide years of reliable service. These instructions include
helpful hints and important information needed to safely
assemble and properly maintain the greenhouse. Please
read these instructions
before
you begin.
If you have any questions during the assembly, contact
Customer Service at 1-800-245-9881 for assistance.
SAFETY PRECAUTIONS
• Wear eye protection.
• Wear head protection.
• Wear gloves when handling metal tubes.
• Use a portable GFCI (Ground Fault Circuit Interrupter)
when working with power tools and cords.
• Do not climb on the greenhouse or framing during or
after construction.
• Do not occupy the greenhouse during high winds,
tornadoes, or hurricanes.
• Provide adequate ventilation if the structure is
enclosed.
• Do not store hazardous materials in the greenhouse.
• Provide proper ingress and egress to prevent
entrapment.
ANCHORING INSTRUCTIONS
Prior to assembling this greenhouse, please read the
MUST READ
document included with the shipment.
WARNING:
The anchor assembly is an integral part
of the greenhouse construction. Improper anchoring
may cause greenhouse instability and failure of the
structure. Failing to anchor the greenhouse properly
will void the manufacturer’s warranty
and may cause
serious injury and damage.
LOCATION
Choosing the proper location is an important step before
you begin to assemble the structure.
The following suggestions and precautions will help you
determine whether your selected location is the best
location.
• Never erect the structure under power lines.
• Identify whether underground cables and pipes are
present
before
preparing the site or anchoring the
structure.
• Location should be away from structures that could
cause snow to drift on or around the building.
• Do not position the greenhouse where large loads
such as snow and ice, large tree branches, or other
overhead obstacles could fall.
•
Always check local building codes before you begin.
SITE
After choosing a location, proper preparation of the site is
essential. The following site characteristics will help
ensure the integrity of the structure.
•
A level site is required
. The site must be level to
properly and safely erect and anchor the structure.
• If the site is not level, use footings to provide a secure
base to assemble the structure. Pre-cast concrete
blocks, pressure-treated wood posts, or poured
footings are all acceptable when properly used. (Some
shelters use ground posts or rafter feet.)
• Drainage: Water draining off the structure and from
areas surrounding the site should drain away from the
site to prevent damage to the site, the structure, and
contents of the structure.
WARNING:
The individuals assembling this structure
are responsible for designing and furnishing all
temporary bracing, shoring and support needed during
the assembly process. For safety reasons, those who
are not familiar with recognized construction methods
and techniques
must seek the help of a qualified
contractor.
ASSEMBLY NOTE:
Install Tek screws using a clutched
drill driver running approximately 750 RPM while applying
approximately 50 lbs of force.
Do not use an impact driver to install Tek screws!
Summary of Contents for Growers supply GrowSpan 106306PC
Page 37: ...37 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 FRONT PROFILE...
Page 42: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 42 Revision date 06 07 18 CONNECTIONS...
Page 43: ...43 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION FRAME DETAILS...