
tainer before measuring for accurate measurements.
Be sure you understand the moisture target required when operating in full heat mode.
To properly establish the desired discharge moisture, hot grain must be fully cooled by the aeration
fan to determine how much moisture will be removed in the cooling process. Then adjust the dryer
discharge moisture to achieve the desired in bin moisture. Usually 1-3 points of moisture are removed
from the hot grain when aerated. This means if 15% grain moisture is ultimately required in storage,
the target value from the dryer should be 16-18%.
Do not confuse the moisture being removed during the in bin cooling process with the
moisture tester "temperature correction" required on some commercial testers. The temperature cor-
rected moisture reading of hot grain being discharged from the dryer is the same moisture reading
that would be obtained if the grain was sealed at the time of measurement and allowed to cool.
62
Summary of Contents for C-21100B
Page 22: ...20 ...
Page 36: ...34 Fig 6 3 LP vaporizer assembly Fig 6 4 ASC control panel ...
Page 49: ...Fig 8 1 Power circuit 220V 3 PH for C 2130B C 2140B C 2160B only 47 4B0280A TIF ...
Page 50: ...48 Fig 8 2 Power cirucit 220V Part wind start for C 2175B C 21100 models only 4B0280C TIF ...
Page 51: ...49 Fig 8 3 Power circuit 440V 3 PH for all C 2100B models 4B0280B TIF ...
Page 52: ...Fig 8 4 Control circuit all models except part wind start p 1 of 3 50 4B0280D TIF ...
Page 53: ...Fig 8 4 Control circuit all models except part wind start p 2 of 3 51 4B0280E TIF ...
Page 55: ...Fig 8 5 Control circuit part wind start models only p 1 of 3 53 4B0280H TIF ...
Page 56: ...Fig 8 5 Control circuit part wind start models only p 2 of 3 54 4B0280I TIF ...
Page 58: ...Fig 8 6 Safety circuit portion of control circuit all models 56 4B0280G TIF ...
Page 65: ......