17
GB
Revisione - 03
Date 06-2022
KJ 45/S-A
ATTENTION!
Disconnect the machine before carrying out the
above-mentioned operations.
CHANGE OF SIZE
(fig.
f9-f10-f11
)
To change the size make as follows:
•
Unscrew the cone-carrying head (
O
) by a 22 mm standard
spanner (
f9
).
• Extract the threaded tie-rod, pushing and lifting it at the
same time (
f10
).
•
After preparing the threaded tie-rod (
A
) of the size you
need, arrange and keep the components as shown in
f11
and assemble. Be sure that the components are correctly
placed, rotating the tie-rod by hand (
f11
).
ATTENTION!
•
The side of the component (
R
) to be entered in the head
of the tie-rod is provided of a magnet to avoid accidental
fall during the operations of change of size.
•
Screw the cone carrying heads (
O
) by a 22 mm standard
spanner and clamp correctly.
22 mm
O
f11
f10
f9