21
3.
Extend the slide fully until it locks out. Depress the spring on the inner member (UPS Section)
and disconnect the inner from the outer member. (Rack Section)
4.
For slide rail installation, fasten the inner portion of the slide rail to the UPS on both sides with
the screws provided. (4) (8-32 x 3/16”) Follow any additional instructions that are included with
the optional slide rail kit (SGRMKIT).
Summary of Contents for SSG6KRM-2
Page 2: ...2...
Page 5: ...5 Double Conversion On line UPS Block Diagram...
Page 7: ...7 Symbols Important Instruction Special Note Recycle Do not dispose with ordinary trash...
Page 12: ...12 SSGR SSGR 1 2 Models...
Page 25: ...25 SSG6KRM 2TXI With Transformer Module Warning Utility sources must be of the same phase...