16/11/2012
14
WASTE WATER CONNECTION
Incorrect installation of the oven may result in the incorrect operation of the
appliance.
Therefore, the drainage Kit supplied by the manufacturer should be installed (Fig.
12). This drainage system should be connected to an open tank or grille.
Installation (Fig. 13 Fig. 14.) should be in such a way as to ensure that the installed
drainage outlet is below the oven outlet with a suitable slope to ensure drainage
(>5% or 3º).
Make sure that the holes on the rising pipe face the side opposite the rear panel to
prevent condensation.
Ensure the measurements for the drainage are correct:
- Steam generator pumping volume in a reduced space of time: 0.7 l/second.
- Average temperature of waste water: 65 ºC
.
Fig.13: Table top models 061-101-102
Fig. 14: Models 201 and 202
Summary of Contents for ADVANCE CONCEPT
Page 20: ...16 11 2012 20 ACE 061 AE 061 APE 061 A Soft water intake C Mains supply D Drainage...
Page 21: ...16 11 2012 21 ACE 101 AE 101 APE 101 A Soft water intake C Mains supply D Drainage...
Page 22: ...16 11 2012 22 ACE 201 AE 201 APE 201 A Soft water intake C Mains supply D Drainage...
Page 23: ...16 11 2012 23 ACE 102 AE 102 APE 102 A Soft water intake C Mains supply D Drainage...
Page 24: ...16 11 2012 24 ACE 202 AE 202 APE 202 A Soft water intake C Mains supply D Drainage...
Page 86: ...99 16 11 2012 86...
Page 92: ...99 16 11 2012 92...
Page 93: ...99 16 11 2012 93...
Page 94: ...99 16 11 2012 94...
Page 95: ...99 16 11 2012 95...