FIRST RUNNING TESTS
!
NC
230 V
ATTENTION: power supply the installation only after
all the electrical connections have been completed.
Once satisfied that all the safety (all NC contact to Elpro S50 controller must be
closed) and command accessories have been connected, and the respective
connections to the Elpro S50 controller made, the first running tests can be
performed.
It is recommended that, before this phase, an accurate analysis of the risks be
executed.
If a radio transmitter is available, after having match encoded it with the radio
receiver following the provided instructions, pulse it once to raise the post.
[C]
Check the electrical connections to the limit switches. Once the system has been power supplied, check the LEDs status
first of all: with the post in the lowered position L12 LED is OFF, while L13 LED is ON. If this does not happen, swap
connections to terminals 11 and 12 on the Elpro S50 control board.
L12
= Limit switch Opening M3, normally
ON, it is off with post in down position
L13
= Limit switch Closing M3, normally
ON, it is off with post in up position
!
ATTENTION: the post must be fully down.
If during the installation phase the post rises, even partially, operate the
manual release to bring it fully down to end of stroke (page 15).
Close all NC
contacts to
Elpro S50
controller
connections to the electric motor of
the oil-hydraulic drive unit
bollard with post in up position:
gateway closed
1° pulse
[B]
Once electric power is supplied, provided that the LEDs of the limit switches are correctly alight (post down L12 led OFF), by
the first pulse the post should rise. If not, swap the connections to the motor live terminals (on Elpro S50) after having
disconnected the electric power supply from the installation.
common
common
English
Anti-terrorism retractable oil-hydraulic bollard
11
12
55
56
11
12
55
56
13