FIRST RUNNING TEST
ATTENTION: supply the system with power only
when wiring is completed.
Pic. 15
All NC contacts to
the Elpro S40
controller must be
closed
Once the bollard and all of the the safety (make sure that all the NC contacts
in the Elpro S40 controller are actally closed) and command accessories are
finally installed, the respective connections to Elpro S40 done and the risk
analysis completed, the first running test can be carried out.
If a remote control is available, once satisfied it has been properly match
encoded with the radio receiver following the instructions provided with it,
pulse once for the post to rise.
[C]
Check the electrical connections to the limit switches; then, once the electric power is supplied, check the status of
the LEDs first of all as follows: with the post in down posistion the L8 LED must be OFF, while L9 must be ON; if not, swap
the connections to terminals 11 and 12 in Elpro S40.
ATTENTION: the post must be fully down. If the post goes up, even partially,
during the installation phase, override the system by the manual release and
allow for the post to go down completely to the end of the permitted stroke,
then tighten by the release spanner (Pic. 23).
SOLENOID VALVE
Voltage stabilizer
Connect a voltage stabilizer
if the bollard is fitted with a
solenoid valve
Pic. 16
If the application requires more than one bollard, go through all of the steps with each of them.
L8
= Limit switch Opening M1, normally
ON, off with the post in down position
L9
= Limit switch Closing M1, normally
ON, off with the post in up position
Retractable Oil-hydraulic Bollard
English
55 56