![background image](http://html1.mh-extra.com/html/fadini/fox-724/fox-724_instruction-use-and-maintenance-manual_4584129024.webp)
Pic. 8
Pic. 7
6.
INSTALLATION
6.1 TOOLS AND MATERIALS
FOUNDATION BOX PREPARATION
450
250
0.0
5 mm
68 mm
600
ø 25
250
5 mm
0.0
GB
- 24
600
450
250
ø 25
ø 32
ø 32
415
175
345
Pic. 5
cement
7m
i
Dwg. 8876
POSITIONING OF PIPES AND DISTRIBUTION BOXES
Digging the trench for the junc on box. Preparing the junc on boxes and corrugated pipes necessary for connec ng to the junc on
box and the drainage pipe.
Level the box on the ground and posi on the pin in line with the upper hinge of the gate. Allow to harden for at least 24 hours.
Clean the inside of the box from any concrete residue.
For installa ons with double leaf
: using a string ed to the end holes of the founda on boxes, align all 4 holes on the same plane.
cement
24h
FOX 724 | FOX 730
Summary of Contents for FOX 724
Page 8: ...Fig 11 max 105 180 180 GRASSO GRASSO IT 8 FOX 724 FOX 730...
Page 10: ...IT 10 M8 6 5 M8 Fig 16 Fig 15 Fig 17 GRASSO 90 FOX 724 FOX 730...
Page 14: ...Fig 24 Fig 25 E19 sinistra destra sinistra destra E19 30mm 90 50mm IT 14 FOX 724 FOX 730...
Page 26: ...GB 26 FOX 724 FOX 730 Pic 11 max 105 180 180 GREASE GREASE...
Page 28: ...GB 28 M8 6 5 M8 Pic 16 Pic 15 Pic 17 GREASE 90 FOX 724 FOX 730...
Page 32: ...Pic 24 Pic 25 E19 Le Right Le Right E19 30mm 90 50mm GB 32 FOX 724 FOX 730...
Page 44: ...Fig 11 max 105 180 180 GRAISSE GRAISSE FR 44 FOX 724 FOX 730...
Page 46: ...FR 46 M8 6 5 M8 Fig 16 Fig 15 Fig 17 GRAISSE 90 FOX 724 FOX 730...
Page 50: ...Fig 24 Fig 25 E19 E19 30mm 90 50mm FR 50 Gauche Droite Gauche Droite FOX 724 FOX 730...