UNCRATING MACHINE
CAREFULLY CHECK THE CRATE FOR ANY SIGNS OF
DAMAGE AND THAT THE BATTERIES ARE IN THE UNIT.
TO UNCRATE THE MACHINE, REMOVE BANDING FROM
AROUND THE CRATE. TAKE OFF THE TOP AND SIDES
AND DISPOSE OF PROPERLY. REMOVE BRACKETS
(A)
FROM MACHINE WHEELS. REMOVE BOLTS
(B)
FROM
PALLET THEN REMOVE BOARD
(C)
. CAREFULLY ROLL
THE MACHINE OFF OF THE BASE.
NOTIFY THE CARRIER
IMMEDIATELY IF CONCEALED DAMAGE IS DISCOVERED
.
(SEE FIGURE 5.)
PAGE 9
MACHINE SETUP
FIGURE 8.
FIGURE 5.
CONNECTING BATTERIES
YOUR MACHINE IS EQUIPPED WITH (TWO) 12 VOLT,
DEEP CYCLE, 140 OR 205 AMP HOURS BATTERIES,
WHICH FORM A 24 VOLT SYSTEM. MAXIMUM BATTERY
DIMENSIONS ARE 7" W X 15" L X 15" H. SEE PICTURE
BELOW FOR CORRECT CABLE CONECTIONS.
1. TURN ALL SWITCHES TO THE OFF POSITION AND
REMOVE KEY (IF MACHINE IS EQUIPPED WITH
OPTIONAL KEY SWITCH).
2. TURN ON MAIN POWER SWITCH AND CHECK
THE BATTERY CONDITION METER TO ENSURE
CORRECT INSTALLATION. CHARGE BATTERIES IF
NEEDED. (SEE: BATTERY CHARGING)
2. LOOSEN THE TWO KNOBS ON THE SQUEEGEE
AND SLIDE THEM INTO THE SLOTS IN THE SQUEEGEE
MOUNTING PLATE. THE SQUEEGEE TRAIL WHEELS
SHOULD FACE OUTWARD.
(SEE FIGURE 7.)
3. TIGHTEN THE TWO KNOBS, AND CONNECT
VACUUM HOSE FROM THE MACHINE TO THE
SQUEEGEE.
(SEE FIGURE 8.)
ATTACHING SQUEEGEE
1. LOWER THE SQUEEGEE MOUNTING PLATE BY
ROTATING THE LIFT LEVER COUNTER-CLOCKWISE.
(SEE FIGURE 6.)
FIGURE 7.
FIGURE 6.
4. YOU MAY HAVE TO ADJUST THE SQUEEGEE PITCH.
(SEE ADJUSTING SQUEEGEE NEXT PAGE)
.
*BATTERY CABLE CONNECTIONS*
A
B
C
Summary of Contents for 2023
Page 26: ...MODEL 2023 2017 SERIES MACHINE PARTS SECTION...
Page 27: ...ACTUATOR LIFT ASSEMBLY 5 4 7 8 10 12 9 1 2 3 11 6 6 7 9 7 PAGE 23...
Page 39: ...2023 FRAME REAR 18 16 17 12 11 20 21 14 19 15 1 2 3 4 5 7 8 9 10 17 18 8 21 13 6 PAGE 35...
Page 41: ...5 8 1 2 7 SCRUB DECK WHEEL ASS Y 6 4 3 PAGE 37...
Page 45: ...20 SHROUD ASSEMBLY PAGE 41 13 5 12 9 1 3 11 4 6 7 7 9 10 10 8 2 8...
Page 49: ...23 SHROUD ASSEMBLY PAGE 45 11 6 9 8 10 7 2 9 13 5 12 8 1 3 4 7 10...
Page 51: ...DISK DECK BRUSH ASSEMBLY PAGE 47 1 8 9 6 5 7 3 10 17 12 16 13 14 14 15 11 4 2...
Page 53: ...VAC MOTOR ASSEMBLY 6 1 3 2 3 8 11 9 12 10 4 5 7 9 PAGE 49...
Page 59: ...TANK LID ASSEMBLY 1 2 3 4 5 9 7 12 6 8 11 PAGE 55 10 10...
Page 67: ...4 1 3 7 6 FRAME SUSPENSION SQUEEGEE 2 5 8 PAGE 63...
Page 69: ...4 FRAME SCRUB DECK 10 1 12 6 6 7 11 3 1 2 9 6 5 8 9 6 8 5 2 PAGE 65 13...
Page 71: ...5 9 8 2 3 4 FRAME BATTERIES TANK TANK LID CONTROL PANEL HANDLE BAR 6 1 7 PAGE 67...