background image

J275 HA 2K20
 

Translation of the original instructions

Summary of Contents for J275 HA 2K20

Page 1: ...J275 HA 2K20 Translation of the original instructions...

Page 2: ...fs Les clients peuvent faire des copies pour leur usage exclusif Ce manuel a t publi en 2020 Copyright FAAC S p A ab dem 2020 Alle Rechte vorbehalten Kein Teil dieses Handbuchs darf reproduziert gespe...

Page 3: ...onnections 19 7 2 Installing the solenoid valve 20 Connecting the control coil 20 Multiple connections 21 7 3 Cover 21 A Marcellan EU DECLARATION OF CONFORMITY The Manufacturer Company name FAAC S p A...

Page 4: ...d drafting the instruc tions for use and maintenance of the machine It should be clearly understoodthatFAACS p A acceptsnoliabilityforthereliabilityand orcompletenessoftheaboveinstructions Assuch them...

Page 5: ...st be in good physical and mental condition aware of and responsible for the hazards that may be generated when using the product The work area must be kept tidy and must not be left unattended Do not...

Page 6: ...e the presence of flamma ble gases or fumes is a serious safety hazard the product is not 94 9 EC ATEX certified It is prohibited to power the system with energy sources other than those specified It...

Page 7: ...e module x7 5 Base with water drainage holes Pit 3 7 COMPONENT IDENTIFICATION 3 6 TECHNICAL CHARACTERISTICS The cylinder is moved by an internal hydraulic unit A release device protected by a security...

Page 8: ...l min Lifting time 8 s Lowering time 4 5 s Ambient operating temperature 15 C to 55 C Ambient operating temperature with optional heater 40 C to 55 C Type of use Intensive Bollard weight 160 kg Pit w...

Page 9: ...ies with applicable regulations in the country of installation Provide the following for each bollard an FG7OR 0 6 1kV 16G1 5 cable maximum length 50 m This code refers to European standards and descr...

Page 10: ...onbox3throughthecable gland provided 2 4 Connect the conductors to the external junction box and the control board following the instructions in section 5 3 5 Check that the bollard operates correctly...

Page 11: ...ning torques given in 9 10 Fasten the cover to the frame using the eight M6x20 screws To reposition or lift the cover prise one of the two slots upwards using a screwdriver 5 2 MANUAL OPERATION Before...

Page 12: ...eplace the plugs 1 4 Lift the head in order to access the release device 5 Actuate the release device by turning the knob anticlockwise RESTORING AUTOMATIC OPERATION 1 14 Actuate the release device by...

Page 13: ...3 21 26 24 22 20 MOT1 COM MOT2 COM COM LAMP FAN J1 N L PE J5 J3 12 J2 J9 M S 13 1 2 3 4 5 7 8 6 10 9 12 13 11 24V Translation of the original instructions ENGLISH 5 3 CONNECTIONS Lights UPPER limit sw...

Page 14: ...e bollard J275 HA 2K20 by performing the following operation 1 Accesslevel1programmingbyholdingdowntheFbuttononthe board 19 The letters dF will appear on the display 2 Release the F button and with th...

Page 15: ...2 COM COM LAMP FAN J1 J2 M4 M5 M6 1 2 3 4 5 6 J5 J3 1 2 3 1 2 3 J5 J3 4 5 6 4 5 6 1 dF 05 2 o 1 1 1 P1 no o2 12 P2 no 3 b6 Y F F F F F F 10 s 1 dF 05 LO C 2 03 Y b6 Y 3 LO Cu 4 o 3 1 5 P3 no F F F F F...

Page 16: ...dreachesthehighposition and reverses immediately Make sure that the limit switches are wired correctly 18 Makesurethattheupperlimitswitchisinthe correct position 2 7 The bollard does not raise Make su...

Page 17: ...Before starting activities wait for the components subject to heating to cool down Do not modify the original components in any way FAAC S p A disclaims any liability for damage caused by components...

Page 18: ...scleanandifnecessarytouchupthepaintwork Checkthattheautomationsystemoperatescorrectly followingtheset logic when using the various control devices 12 6 2 TOPPING UP THE OIL LEVEL 1 Release and lower t...

Page 19: ...flange together with the seal provided Insert the cable in to the cable gland 2 and connect it to connector 3 inside the junction box according to the diagram shown in the figure Violet Blue Blue Brow...

Page 20: ...istribution flange 4 Screw the solenoid valve onto the distribution flange 5 Install the control coil onto the solenoid valve 6 Removetheplugfromthecablegland 34 1 insertthecableand connect it to the...

Page 21: ...slaveconfiguration connectthecoilsto the inputs of the relative control board master or slave as indicated in the following diagram Master JE275 board Slave JE275 board 7 3 COVER Use the cover to mak...

Page 22: ...FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 09 57 820 www faac it www faacgroup com J275 HA 2K20 22 532270 Rev A...

Reviews: