37
38
36
J275 HA 2K20
21
532270 - Rev.A
S
25
23
21
26
24
22
20
MOT1
COM
MOT2
COM
COM
LAMP
FAN
1
2
3
25
23
21
26
24
22
20
MOT1
COM
MOT2
COM
COM
LAMP
FAN
4
5
6
S
S
S
S
S
S
25
23
21
24
22
20
MOT1
COM
COM
COM
LAMP
FAN
1
2
3
S
S
Tr
ansla
tion of the original instruc
tions
ENGLISH
If multiple bollards (more than 3) are installed, which are controlled
by JE275 boards in a master / slave configuration, connect the coils to
the inputs of the relative control board (master or slave) as indicated
in the following diagram.
Master JE275 board
Slave JE275 board
7.3 COVER
Use the cover to make the pit of the bollard, which has not yet been
installed, safe (e.g. while the concrete is drying). Fasten the cover
to the subframe using 4 of the 10 M12x30 screws supplied with the
bollard.
MULTIPLE CONNECTIONS
If multiple bollards (max 3) are installed, which are controlled by a
single JE275 board, connect the coils in parallel as indicated in the
following diagram.