FAAC GENIUS Sprint 382 Manual Download Page 6

Fig. 11

Fig. 13

Fig. 14

Fig. 12

SPRINT  382  -  SPRINT  383 

00058I0112        -  Rev.6

Tr

ansla

tion of the original instruc

tions

ENGLISH

4.2. J7 Terminal board - Power supply (

fi

 g. 2)

POWER SUPPLY (

TERMINALS

 PE-N-L): 

• 

PE:

 Earth connection

• 

N:

   power supply ( Neutral )

• 

L:

   

 power supply ( Line )

 For correct operation, the board must be connected to the earth conductor 

in the system. Install an adequate differential thermal breaker upstream 
of the system.

4.3. J6 Terminal board - Motors and 

fl

 ashing lamp (

fi

 g. 2)

• 

MOTOR - (terminals 13-14-15):

 Motor connection. In gearmotors with a built-in 

control unit, this connection is pre-wired standard. PFor leaf opening direction, 
see basic programming in Chpt 5.1. 

• 

LAMP - (terminals 16 -17):

 Flashing lamp output 

4.4. J1 Terminal board - Accessories (

fi

 g. 2)

• 

OPEN A - “Total Opening” command (terminal 1):

 any pulse generator 

(push-button, detector, etc.) which, by closing a contact, commands total 
opening and/or closing of the gate leaf.

To install several total opening pulse generators, connect the N.O. contacts 
in parallel (see 

fi

 g. 14).

• 

OPEN B - “Partial opening “ or “Closing” command (terminal 2):

 any pulse 

generator (push-button, detector, etc.) which, by closing a contact, commands 
partial opening and/or closing of the gate leaf. In the B and C logics, it always 
commands gate closure.

To install several partial opening pulse generators, connect the N.O. 
contacts in parallel (see 

fi

 g. 14).

Connection of a pair of closing photocells, a pair of opening photocells and 

a pair of opening/closing photocells

Connection of two pairs of closing photocells and two edge safety devices

Connection of two N.O. contacts in parallel

(e.g. Open A, Open B)

Connection of a pair of closing photocells and a pair of opening/closing 

photocells

Summary of Contents for GENIUS Sprint 382

Page 1: ...print 382 Sprint 383 Translation of the original instructions Traductiondelanoticeoriginale bersetzung der Original Anleitung Traducci ndelmanualoriginal Vertalingvandeoorspronkelijkegebruiksaanwijzin...

Page 2: ...crushing safety device consisting of a torque control Nevertheless its tripping threshold must be checked as specified in the Standards indicated at point 10 16 The safety devices EN 12978 standard pr...

Page 3: ...INPUTS CHECK page 7 7 AUTOMATED SYSTEM TEST page 7 EU DECLARATION OF CONFORMITY The Manufacturer Company name FAAC S p A Soc Unipersonale Address Via Calari 10 40069 Zola Predosa BOLOGNA ITALY hereby...

Page 4: ...rd inputs Open P artial opening Safety devices at opng Safety devices at clsng Stop Edge Power supply Earth On connector inputs Opening and closing limit switches Encoder Terminal board outputs Flashi...

Page 5: ...against the risk of impact Opening closing safety devices they operate during the gate opening and closing movements and therefore they are suitable for protecting the opening and closing areas again...

Page 6: ...PEN A Total Opening command terminal 1 any pulse generator push button detector etc which by closing a contact commands total opening and or closing of the gate leaf To install several total opening p...

Page 7: ...essories terminals 7 and 8 24 Vdc Positive for power supply to accessories terminals 9 and 10 Accessories max load is 500 mA To calculate absorption values refer to the instructions for individual acc...

Page 8: ...e sequence of functions accessible in ADVANCED PROGRAMMING ADVANCED PROGRAMMING F Display Function Default b0 MAXIMUM TORQUE AT INITIAL THRUST The motor operate at maximum torque ignoring the torque s...

Page 9: ...ng to the performed deceleration spaces 2 0 ADVANCED PROGRAMMING F Display Function Default AS ASSISTANCE REQUEST combined with next function If activated at the end of countdown settable with the nex...

Page 10: ...No effect OPEN disabled No effect No effect OPEN disabled OPEN on PAUSE Stops operation Stops operation No effect Reloads pause time OPEN disabled No effect OPEN disabled ON CLOSING Re opens the leaf...

Page 11: ...o effect OPEN disabled No effect No effect OPEN disabled OPEN Re closes the leaf immediately Stops operation No effect No effect OPEN disabled ON CLOSING Stops operation No effect saves OPEN see parag...

Page 12: ...effect OPEN A B disabled Tab 3 h LOGIC BC OPENING PULSES CLOSING COMMANDS ALWAYS PRESSED PULSES GATE STATUS OPEN A opening OPEN B closing STOP OPENING SAFETY DEVICES CLOSING SAFETY DEVICES OP CLOS SA...

Page 13: ...746 E R 41 732099 Rev D...

Page 14: ......

Page 15: ...icherheitsvorrichtungen Norm EN 12978 erm glichen den Schutz eventueller Ge fahrenbereiche vor mechanischen Bewegungsrisiken wie zum Beispiel Quetschungen Mitschleifen oder Schnittverletzungen 17 F r...

Page 16: ...Sede legale FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 09 57 820 www geniusg com SPRINT 382 SPRINT 383 12 00058I0112 Rev 6...

Reviews: