![FAAC E124 Original Instructions Manual Download Page 15](http://html1.mh-extra.com/html/faac/e124/e124_original-instructions-manual_3115894015.webp)
E124 13
532365 - Rev.A
Tr
ansla
tion of the orig
inal instruc
tions
ENGLISH
GATECODER (ENC)
17 18 19 20
ENC
1
ENC
2
GND
+2
4
Gatecoder 2
Gatecoder 1
Connect the FAAC Gatecoder encoder (optional) to the
ENC terminal board. The figure shows the connec-
tion of one Gatecoder on Leaf1 and one on Leaf2. If
only one Gatecoder is used, there is no need to bridge
unused inputs to ground.
Gatecoder terminal board
17
ENC1 Gatecoder on Leaf1
18
ENC2 Gatecoder on Leaf2
19
+24 Accessories power supply
20
GND Common contacts
-
Functions available in Advanced programming:
En
(enable/disable the encoders).
CONFIGURABLE OUTPUTS (OUT1, OUT2)
+
OUT2
-
OUT1
+
-
!
Do not exceed the maximum load for each output: 24
V
"
with 100 mA.
Each NO type Open Collector output is activated ac-
cording to the programmed function.
OUT active
OUT not active
24 V
"
open circuit
- Functions available in Advanced programming:
o1
(
OUT1
- default: ALWAYS ACTIVE)
o2
(
OUT2
- default: LED)
t1
,
t2
(timing
OUT1
,
OUT2
: duration of output, if a timed
function is programmed).
FLASHING LIGHT 24 V
"
(LAMP)
!
Do not exceed the maximum load 24 V
"
with 15 W.
The flashing light indicates that the automation is mov-
ing and must be installed in a position that is visible from
inside and outside the property.
Connect the flashing light to the intermittent output
on the LAMP terminal board.
- Functions available in Advanced programming:
PF
(pre-
flashing - of 3 s before movement,
AS
scheduled maintenance
request - further 8 s of pre-flashing).
ELECTRIC LOCK (LOCK/ OUT1, OUT2)
E124 controls an electric lock to block the leaf in the
closed position.
Connect the FAAC electric lock to the LOCK terminal
board.
If you use an electric lock NOT manufactured by
FAAC, connect a suitable 24
"
interface relay to one
of the programmable outputs OUT1 / OUT2. Use an
external power supply to power the electric lock.
Then program the output for an electric lock NOT
manufactured by FAAC (Advanced program-
ming:
o1
/
o2
=
11
).
- Functions available in Advanced programming:
cS
(closing
thrust),
rS
(reverse stroke in opening),
EL
(electric lock on
Leaf2).
MOTOR 1 (MOT1)
M1
MOT2
MOT1
1 2 1 2
In single leaf automations, the motor must be con-
nected to MOT1.
In 2-leaf automations, the motor of the first leaf that
opens (
LEAF1
) has to be connected to MOT1. This
would be the overlapping leaf, if present.
- Functions available in Basic programming:
Mn
(number of mo-
tors),
Cd
(closing delay - option for 2-leaf automation).
MOTOR 2 (MOT2)
MOT2
MOT1
1 2 1 2
M2
In 2-leaf automations, the motor of the second leaf that
Summary of Contents for E124
Page 1: ...E124 Translation of the original instructions...
Page 43: ......