3
4
E124
8
532365 - Rev.A
Ø16/20/25
Tr
ansla
tion of the orig
inal instruc
tions
ENGLISH
5. INSTALLATION
RISKS
PERSONAL PROTECTIVE EQUIPMENT
F
CARRY OUT THE WORK WITH THE ELECTRICAL POWER
SUPPLY DISCONNECTED.
If the power disconnect switch is not in view, place a
“WARNING - Maintenance in Progress” sign on it.
Turn the power on only after having made all the
electrical connections and carried out the preliminary
start-up checks.
Never remove the board cover unless the instructions
specifically indicate that you should do so.
!
Handle the enclosure carefully so as not to damage the
board and the components.
TOOLS REQUIRED
8
4
5.1 INSTALL THE ENCLOSURE
REMOVE THE COVER
) To release the hinges, press on the catch of each
hinge and then remove them.
PREPARE THE CABLE ROUTING HOLES
) Open the cable routing holes to a diameter
suitable for the diameter if the conduits. Install suit-
able cable glands.
Remove the cover
Prepare the cable routing holes
(open to a suitable diameter)
Summary of Contents for E124
Page 1: ...E124 Translation of the original instructions...
Page 43: ......