7
min 10 "
2.3 Setting up the gate
Allow the concrete to set before starting this operation.
1. Assemble the release levers on the support bracket, and
fit the latter on the pivot in the foundation box, also inser-
ting the supplied ball (Fig. 8).
Note: grease both the pivot and the ball.
2. Prepare the guide bracket, as follows:
• Use a “U” profile with dimensions indicated in Fig. 9.
S
2½
6⅛
2¼
~12⅜
6⅛
~17⅜
Fig. 5
Fig. 6b
~17⅜
~12⅜
90°
Fig. 7
Ø 1⅜
Fig. 6a
* Measurements
in Inches
* Measurements in Inches
* Measurements in Inches
* Measurements
in Inches
2.2 Installing the foundation box
1. Dig a hole for the foundation box as shown in Fig. 5.
2. Place the foundation box in the hole, refer to the dimen-
sions provided in Figs. 6a and 6b.
The center of the pivot on the foundation box must be per-
fectly aligned with the leaf’s axis of rotation (Figs 6a and 6b).
3. Install a 1-3/8" Liquid Tight Conduit, it must be long
enough to reach from the box to the control unit (Fig. 7).
Install also a second conduit to drain water from the box
(also Fig. 7).
4. Secure the box in place with a concrete pour.
Depending on the nature of the ground, it may be neces-
sary to cast a bed of quick-setting concrete at the bottom
of the hole to avoid future subsidence.
Fig. 8
Fig. 9
min 1.5"