background image

12

Fig. 23

Turn the screws clockwise to increase the
intensity of the deceleration.

Caution!

Reduce deceleration action to a

low setting if the system normally has to work
in ambient temperatures above 20 °C. This
avoids deceleration becoming too abrupt
when the temperature drops.

If the total angle of opening of the leaf is less
than 90°, the 760 operators model CR can
be set up so that deceleration is only active
on the closing cycle.

To ensure trouble-free operation, before you
fix the operator inside the foundation box,
move the leaf manually to a distance D from
its fully closed position:

D = L x 0.76 (fig. 23)

where L = leaf length.

See section 5.2 for details on how to set the
internal closed position travel stop adjusting
screws.
Adjustment of the internal open position
travel stop has no effect.

If the gate ever has to be operated manually
as a result of a power failure or malfunction,
release the gate with the key release device.

The release device, without the lock, is
supplied with the operator’s installation kit.

The key lock is available as an accessory in
two versions, with standard or numbered key.

See fig. 24 to fit the key lock to the release
device

7.

Manual Operation

Fig. 24

6.

Angles of opening below 90

°

Summary of Contents for 760

Page 1: ...lug the equipment from the electrical supply network either by removing the plug or by turning off the system s main switch An isolation switch should be provided for the installation according to by...

Page 2: ...x Manual release 418137 1 x Electronic control unit 450 MPS 790902 1 x Control box container 720118 1 x 418mhz receiver IRM418 1 x MINIDEC decoder IMINIDECSL 1 x 418 mhz transmitter ITI418 1 x FAAC L...

Page 3: ...chnical Specifications 1 Bleed screw 2 By pass valves 3 Release device 4 Release lock optional accessory 5 Oil filler plug 6 Mechanical travel stop adjusting screw 7 Deceleration ramp adjusting screw...

Page 4: ...e opening closing stationary internal TA TC F x 100 TA TC TP TI TA opening time TC closing time TP stationary time TI length of interval between one complete cycle and the next duty cycle Time h 3 1 M...

Page 5: ...bottom edge of gate and ground as in fig 6 a where s thickness of guide bracket mechanical travel stops If any welding or brazing has to be done on the gate do this before installing the automation s...

Page 6: ...of quick setting concrete at the bottom of the hole to avoid subsidence in future 2 Insert the base box in the hole fig 6 a b The centre of the pinion must be perfectly aligned with the leaf s axis of...

Page 7: ...water drain fig 8 4 Fix the box with concrete N B Wait for the concrete to set before starting this work 1 Prepare the gate guide bracket as follows Use a U profile of the dimensions given in fig 9 As...

Page 8: ...Seal the U profile on the post side with a plate as shown in fig 13a b 2 Grease the pinion 3 Fit the guide bracket over the pinion so that the tooth with the punch mark engages in the bushing notch a...

Page 9: ...tallation To determine the precise angle a measure the length of line L fig 17 and position the gate at the mid point of the line 4 Fit the operator inside the box and engage the rack ram with the pin...

Page 10: ...the outer edge of the gate Use a linear dynamometer to ensure that force at the outer edge of the gate is measured accurately Turn the by pass valve screws as shown in fig 19 to set the anti crushing...

Page 11: ...ed position limit stop 8 Slacken off the lock nut from the open travel stop adjusting screw fig 20 a 9 Slacken off the open travel stop adjusting screw fig 21 until the leaf starts moving 10 Screw in...

Page 12: ...oundation box move the leaf manually to a distance D from its fully closed position D L x 0 76 fig 23 where L leaf length See section 5 2 for details on how to set the internal closed position travel...

Page 13: ...can only be removed when in vertical position Checking the oil level The oil level must be kept just below the filler plug hole fig 27 For low to medium duty cycles you need only change the level once...

Page 14: ...the operator reaches the end of the opening cycle 5 Give a closing signal to the gate 6 While the gate is closing remove the access cover and slacken off the closing bleed screw ref D fig 20 a b as sh...

Page 15: ...chnical or commercial reasons at any time and without revising the present publication Your Authorised FAAC Dealer Simply the world s best welcome And that s a FAACT FAAC UK Ltd Old Brick Kiln Ramsdel...

Reviews: